SCP-6581
Safe
~
medium confidence
SCP-6581
Expected annual
$3.9M
One-time setup
$12.3M
Annual recurring
$3.8M
Personnel
16
Estimated one-time capital and contingency needs are approximately $12,310,000, with ongoing annual operations around $3,782,500; the largest cost drivers are permanent-seal/endowment, contingency funds/excavation contingencies, structural stabilization and recurring patrol/ROV/logistics and staff wages.
One-Time Capital Costs
Total: $12.3M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal year with regular inspections, maintenance, and no major incidents.
scheduled_inspections
routine_maintenance
no_intrusions_or_breaches
🚨
Minor Incident
$4.3M/yr
Localized seal degradation or small intrusion requiring rapid response, repairs, and limited PR/legal work.
seal_failure
small_inundation
limited_discovery_by_civilians
🚨
Major Breach
$6.3M/yr
Significant breach or automata activation requiring large-scale salvage, containment escalation, and legal/PR response.
structural_collapse
multiple_seal_failures
SCP-6581-1_activation
🚨
Archaeological Excavation
$5.8M/yr
Authorized project year to open sealed chamber for excavation and recovery (planned contingency executed).
policy_decision_to_exhume
extended_diver_charters
surge_conservation_and_analysis
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 5 | [#13] Shore-side and vessel rotation security personnel for patrols and site operations. |
| On-call Emergency Response / Diver Med Specialists | 4 | [#12] Trained salvage/hyperbaric divers and medical staff for entrapments, flooding events, and specialist response readiness. |
| Research Scientist / Paranormal Containment Staff | 3 | [#15, #18] Staff conducting paranormal containment research, analysis, and ongoing scientific contracts. |
| ROV Pilot / Operator | 2 | [#8, #9] ROV pilots and operators for routine inspection campaigns and intervention tasks. |
| Conservation Technician / Lab Staff | 2 | [#17] Conservation lab technicians handling artifact stabilization, sampling, and lab operations. |
Confidence Notes
Estimates are based on analyst-provided ranges and canonical containment practices; uncertainty remains due to choices between infrastructure options (cable vs. buoy), unpredictable anomalous behavior, and contingent decisions (excavation or permanent sealing).