SCP-6613
Euclid
~
medium confidence
SCP-6613
Expected annual
$2.8M
One-time setup
$11.2M
Annual recurring
$2.6M
Personnel
16
One-time capital expenditures are approximately $11.18M driven primarily by interception options (sounding rocket/smallsat) and contingency/reserve funds; recurring annual operating costs are approximately $2.62M/yr driven by staff wages, research/monitoring, and program overhead.
One-Time Capital Costs
Total: $11.2M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal year with continuous monitoring, analysis, and routine operations; no major incidents or high-altitude intervention.
steady monitoring workload
no major leaks
no intervention launches
🚨
Minor Incident
$2.9M/yr
Localized exposure or leak requiring intensified PR, legal action, additional takedowns and limited buyback operations.
spike in civilian detections
viral clip requiring takedown
local complaints/legal claims
🚨
High Altitude Intervention
$4.1M/yr
Decision to attempt interception/inspection at ~64 km via sounding rocket or commissioning a smallsat, incurring major one-time launch expense.
decision to physically inspect source
escalation in anomalous activity
operational directive to deploy launch asset
🚨
Major Breach
$8.1M/yr
Significant exposure or hazardous broadcast causing public harm or severe operational compromise, requiring emergency neutralization and large settlements/response.
harmful broadcast effects
large-scale leak
necessity of emergency interdiction
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / RF Engineer | 4 | [#5] RF engineers/analysts responsible for monitoring, localization and equipment maintenance (4 FTEs as budgeted). |
| Linguist / Media Analyst | 2 | [#6] Linguists to transcribe/translate and analyze broadcast content (2 FTEs). |
| Memetics / Psych Researcher | 2 | [#6] Memetics/psych staff for controlled exposure research and analysis (2 FTEs). |
| Security Officer / Field Tech | 6 | [#7] Local security for antenna stations and travel/maintenance field teams (6 FTEs). |
| Administrative Staff / Project Manager | 2 | [#24] Program management, finance and procurement staff covered within overhead allocations (2 FTEs). |
Confidence Notes
Analyst notes provide detailed line-item estimates for equipment, personnel and contingencies, so category-level costs are reasonably bounded; however high-cost items (sounding rockets, smallsats, emergency intervention reserves) and anomalous behavior introduce significant uncertainty.