SCP-6618
Unknown
~
medium confidence
SCP-6618
Expected annual
$2.1M
One-time setup
$539K
Annual recurring
$2.0M
Personnel
12
First-year capital expenses are moderate (~$539k) driven by specialized equipment and secure facilities; recurring annual costs are dominated by personnel, webcrawler/monitoring and legal/cover-story budgets, totaling about $2.02M/yr.
One-Time Capital Costs
Total: $539K
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal year of operations with routine monitoring, training, and no significant leaks or field incidents.
routine operations
no online leaks
no field recoveries beyond baseline
🚨
Minor Incident
$2.3M/yr
Localized leak or single external copy discovered leading to limited takedown/legal action and 1–2 extra field recoveries.
single online leak
localized public exposure
one or two field recovery ops
🚨
Major Breach
$3.5M/yr
Widespread discovery of multiple copies or evidence of technopathic propagation requiring mass takedowns, many field recoveries, emergency medical support and scaled research response.
multiple copies discovered
technopathic/technological propagation
international field-recovery campaign
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Project Lead / Research Lead | 1 | [#6] Senior lead overseeing containment, research and authorized playbacks. |
| Research Scientist (senior) | 2 | [#6] Two senior researchers for experiments, analysis and SOP development. |
| Lab Technician / Engineer | 1 | [#6] Technician for capture hardware, playback maintenance and experiments. |
| Security Technician (tech) | 1 | [#6] Technical security/support role integrated with lab operations. |
| Webcrawler / Darkweb Analyst | 3 | [#7] Dedicated analysts for continuous webcrawler triage and monitoring. |
| Security Officer / Site Guard | 3 | [#10] Dedicated guard FTE equivalents for escorting & two-person rule enforcement. |
| Medical Officer / Psychologist | 1 | [#9] Part-time/contract psychologist for pre-screening, post-exposure counseling and crisis response. |
Confidence Notes
Costs are based on analyst-provided ranges and SCP operational practices; many items have wide ranges (e.g., specialized instrumentation, legal exposure frequency), so estimates are reasonable but contain uncertainty.