SCP-6656
Unknown
?
low confidence
SCP-6656
Expected annual
$2.0M
One-time setup
$5.5M
Annual recurring
$1.9M
Personnel
18
Initial one-time costs are dominated by salvage/recovery, containment construction, heavy transport and large contingency reserves; recurring costs are dominated by staff wages and ongoing security/monitoring. First-year capital plus setup is roughly $5.49M, with annual baseline operating costs ≈ $1.92M.
One-Time Capital Costs
Total: $5.5M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal year with no major incidents; routine operations, monitoring, and scheduled maintenance.
routine_operations
no_major_incident
🚨
Minor Incident
$2.1M/yr
Localized containment issue or small-scale damage requiring emergency response and repairs.
localized_damage
minor_leak_or_leaching
small_security_breach
🚨
Major Breach
$3.4M/yr
Significant breach or attack (e.g., GOC/third-party action or anomalous activation) requiring major containment upgrades or emergency relocation.
GOC_direct_attack
entity_activation
structural_failure
🚨
Political Exposure
$2.4M/yr
High-visibility diplomatic/media incident requiring extended negotiations, legal action, and paid cover-ups.
media_leak
GOC_negotiations
local_government_pressure
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#10] 24/7 guard coverage (6–8 guards to cover shifts) included in recurring security wages. |
| Site Security Supervisor | 1 | [#10] Supervisor/shift lead included in security staffing estimates. |
| Research Scientist | 6 | [#12] Materials scientists, conservators and archaeologists (4–8 FTEs). |
| Technician / Lab Technician | 2 | [#3, #11] Technical staff for ROV/monitoring support and lab assistance. |
| Engineer / Maintenance | 1 | [#7, #9] On-site engineer for crane, power and containment system maintenance. |
| Administrative Staff | 1 | [#16, #17] Admin and liaison support for permits, contracting and cover operations. |
| Medical Officer | 1 | [#10] On-call medical support for dive/field operations and staff health. |
Confidence Notes
High uncertainty in depth, true mass, structural integrity and anomalous properties drives low confidence; cost ranges and contingency reserves reflect unknowns and contractors' variable pricing.