SCP-6657
Safe
~
medium confidence
SCP-6657
Expected annual
$1.9M
One-time setup
$1.9M
Annual recurring
$1.9M
Personnel
8
Estimated one-time setup of $1,880,000 driven by shielding, lab infrastructure and research program startup; recurring annual costs of $1,873,000 driven primarily by staff wages, outsourced instrumentation and ongoing research/compliance.
One-Time Capital Costs
Total: $1.9M
Annual Recurring Costs
Total: $1.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.9M/yr
Normal operational year with scheduled research and maintenance, no major incidents.
routine_research
maintenance_and_audits
🚨
Minor Incident
$2.2M/yr
Minor containment or experimental incident (equipment failure or small radiation leak) requiring cleanup, temporary shutdown and limited equipment replacement.
equipment_malfunction
minor_radiation_release
human_error
🚨
Major Breach
$3.4M/yr
Significant shielding failure or experimental catastrophe causing public exposure, large cleanup, regulatory fines and prolonged program suspension.
critical_shielding_breach
major_experimental_failure
public_exposure
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / PI | 1 | [#13] Senior PI leading materials/optical research (approx. $180,000/yr). |
| Research Scientist / Optical Physicist | 1 | [#13] Optical physicist responsible for experiments and instrument calibration (approx. $140,000/yr). |
| Lab Technician | 2 | [#13] Laboratory technicians to run experiments, consumables handling, and sample prep (approx. $60,000 each). |
| Radiation Safety Officer / Compliance | 1 | [#12] Full-time RSO to manage licensing, audits, training and compliance (salary ~midpoint used in recurring costs). |
| Containment Technician / Security Officer | 3 | [#14] On-site containment technicians and security staff to maintain locker, escort researchers and provide shift coverage. |
Confidence Notes
Many line items are well-scoped (shielding, monitoring, staffing) but cost ranges are broad and some expenses (outsourced national-lab time, contingency for accidental emissions, choice to buy vs outsource instrumentation) introduce notable uncertainty.