SCP-6666
Unknown
~
medium confidence
SCP-6666
Expected annual
$76.8M
One-time setup
$117.5M
Annual recurring
$72.6M
Personnel
172
Initial capital expenditure is approximately $118M, dominated by site construction (SAFOS), air assets, and research/lab buildout; ongoing annual operations are roughly $72.6M/yr driven by personnel, air/transport ops, long-term endowment and contingency reserves.
One-Time Capital Costs
Total: $117.5M
Annual Recurring Costs
Total: $72.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$72.6M/yr
Routine year with no major containment escalation; scheduled maintenance, rotations, research and planned burns proceed as budgeted.
normal_operations
scheduled_burns
routine_research
🚨
Minor Incident
$77.6M/yr
Localized breach/rapid root encroachment requiring emergency increased incendiary operations, replacement of damaged sensors/vehicles, and limited legal/PR response.
root_encroachment_requiring_mass_burn
equipment_loss
local_media_inquiry
🚨
Major Breach
$132.6M/yr
Significant expansion or partial containment failure requiring mobilization of contingency reserve, international coordination, mass evacuations and strategic strikes or denial operations.
large_scale_breach
international_military_coordination
full_scale_escalation
Personnel
172 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 90 | Armed 24/7 security rotations, quick reaction teams and lethal-response squads (matches note #5 staffing range). |
| Research Scientist | 30 | Specialist multidisciplinary team (botanists, mycologists, geologists, linguists, thaumaturgy) per note #18. |
| Specialized Fire Team | 20 | Rotational burn crews with short exposure windows; included in payroll assumptions (note #6). |
| Pilot / Flight Crew | 8 | Pilots and flight-crew for helicopters/VTOLs and UAV operators (note #7). |
| Engineer / Maintenance | 10 | Mechanical, electrical and containment engineers for SAFOS, generators, sensors and robotic systems (note #19, #9, #13). |
| Medical Officer | 6 | Medics trained for neurotoxin exposure, medevac coordination and long-term monitoring (note #16). |
| Administrative Staff | 6 | Logistics, procurement, and site admin to support covert operations and cover story maintenance (notes #21, #23). |
| Site Director / Executive Staff | 2 | Site leadership and senior project management (PARAGON SAFOS management roles). |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing midpoint estimates, but the anomalous nature and wide ranges for many items (land acquisition, contingency needs, escalation scale) limit precision; therefore confidence is medium.