SCP-670
Safe
~
medium confidence
SCP-670
Expected annual
$302K
One-time setup
$516K
Annual recurring
$298K
Personnel
3.35
First-year (one-time) setup costs are roughly $517k driven primarily by secure cell construction and optional conservation/fire-suppression choices; annual operating costs are ~ $298k/yr driven by staff wages, ongoing research, and emergency reserves.
One-Time Capital Costs
Total: $516K
Annual Recurring Costs
Total: $298K/yr
Cost Scenarios
📊
Baseline
(baseline)
$298K/yr
Normal uneventful year with routine operations, no major incidents or capital upgrades.
routine operations
scheduled maintenance
normal research sampling
🚨
Minor Incident
$313K/yr
Localized incident such as sharps injury, small weapon confiscation and disposal, limited medical care and overtime.
needle injury
small containment breach
extra disposal/incineration runs
🚨
Major Breach
$498K/yr
Significant disassembly/death or containment breach requiring emergency relocation, large-scale cleanup, medical response and reconstruction.
full disassembly of a member
medical evacuation
relocation/reconstruction
🚨
Fire Suppression Upgrade
$410K/yr
Management/audit-driven capital decision to replace water-based suppression with inert-gas/clean-agent system to mitigate flame risk.
safety audit recommendation
policy decision to avoid water suppression
Personnel
3.35 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 2 | [#5] Two designated guards assigned to this sector (salaries totaling ~$90,000). |
| Containment Technician / Caretaker | 1 | [#6] One full-time technician responsible for daily checks and handling non-hostile interactions (~$60,000). |
| Research Scientist (fractional FTE) | 0.2 | [#7] Fractional research allocation (~0.2 FTE portion of ~$38k combined research staffing). |
| Medical Technician (fractional FTE) | 0.1 | [#7] Fractional medical tech support included in research/medical allocation. |
| Behavioral Specialist / Psychologist (fractional FTE) | 0.05 | [#7] Fractional behavioral specialist time for interviews/monitoring included in research allocation. |
Confidence Notes
Many line items are explicitly estimated in analyst notes and SCP containment needs are well-described, giving reasonable precision; uncertainty remains due to optional capital choices (suppression, conservation) and variability in incident frequency, so confidence is medium.