SCP-673
Keter
?
low confidence
SCP-673
Expected annual
$6.6M
One-time setup
$10.9M
Annual recurring
$6.3M
Personnel
24
[#30] Initial one-time capital is estimated at approximately $10,892,500 driven primarily by containment construction, robotics/incineration equipment, research instrumentation and contingency/reserve funding; recurring annual costs are estimated at $6,308,500 driven mainly by staff wages, legal/PR, maintenance, sterilant and disposal/contract retainer costs.
One-Time Capital Costs
Total: $10.9M
Annual Recurring Costs
Total: $6.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.3M/yr
Normal operational year with no major incidents; ongoing containment, research, maintenance and routine transfers.
routine_transfers
scheduled_maintenance
normal_research_activity
🚨
Minor Incident
$6.6M/yr
Localized contamination or small overgrowth requiring temporary cell use, targeted repairs, additional quarantine and legal/contracted response.
localized_overgrowth
small_containment_breach
targeted_rebuild_and_extra_quarantine
🚨
Major Breach
$16.3M/yr
Significant containment failure or large-scale integration event requiring mass decontamination, demolition/rebuild, large-scale evacuation and major legal/PR response.
large_scale_integration
widespread_contamination
major_rebuild_and_remediation
Personnel
24 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 9 | [#13] 24/7 armed security staff (6–12 recommended), numbers chosen mid-range; overtime and rapid-response costs budgeted in staff_wages. |
| Research Scientist | 4 | [#15] Pathology/biochemistry/materials researchers to study tissues and run high-end instrumentation. |
| Containment Technician / Maintenance | 6 | [#14] Technicians for equipment operation, sterilization, chemical handling and cell rebuilds. |
| Medical Officer | 2 | [#11, #12] Staff to run quarantine ward, medical surveillance and post-exposure diagnostics. |
| Engineer / Maintenance | 2 | [#4, #5] Engineers for HVAC, negative-pressure systems, backup power and structural repairs. |
| Administrative Staff | 1 | [#23, #29] Records/IT liaison, contract management and administrative support. |
Confidence Notes
Cost ranges are wide and driven by uncertain incident frequency, unknown supplies (NioX-9 availability/cost), variable legal/PR exposure and potential catastrophic scenarios; many items are order-of-magnitude estimates rather than fixed quotes.