SCP-6744 Unknown ? low confidence
SCP-6744
Expected annual
$3.4M
One-time setup
$3.5M
Annual recurring
$3.3M
Personnel
17
Initial one-time setup and specialized equipment/R&D dominate costs (~$3.5M one-time). Annual staffing, specialized research, security, and contingency replenishment drive recurring costs (~$3.33M/yr).
🏗️ One-Time Capital Costs Total: $3.5M
Contingency Reserve Establishment $1.1M
[#20] Establishment of internal contingency/liability reserve (one-time seed fund as an emergency pool).
Facilities $965K
[#1, #9, #16, #25] Renovation of Director's office into secure thaumaturgic containment chamber (#1), emergency HVAC/localized heating installation (#9), lockable climate-controlled vault for remains/evidence (#16), and long-term decommission/remediation fund (site remediation/ward removal) (#25).
Equipment $715K
[#2, #6, #7, #10, #12, #22] Permanent warding hardware and installed sigil fixtures (#2 initial), multi-modal sensor suite procurement including training/integration (#6), hardened/analog archival systems and film lab buildout (#7 one-time portion), backup generators/UPS procurement (#10), PPE/thaumic shielding gear for staff (#12 one-time), and communications hardening hardware/air-gapped infrastructure (#22 one-time).
Initial Research And Lab Setup $700K
[#8, #15] Experimental anti-corruption recording R&D/prototyping project (#8) and procurement/authentication of rare reagents/artifacts required for rituals (#15).
Incident Response Kits Initial $20K
[#11] Initial procurement of multi-modal consumable incident-response kits (salts, inks, candles, portable ward panels, mobile heaters, PPE, evidence kits).
Director Relocation Preparation $20K
[#17] One-time readiness/secure-transport preparation costs for potential Director relocation events (armored transport, temporary secure lodging preparation).
🔄 Annual Recurring Costs Total: $3.3M/yr
Staff Wages $1.5M/yr
[#3, #4, #5, #17] Salaries for specialized thaumaturgy/ontokinetics research team (~$650k/year) (#3), security detail base salaries for 24/7 coverage (~$525k/year) (#4), full-time clinical psychologist/psychiatrist salary (~$150k/year) (#5), and ongoing remote-operations staffing/administration for relocation/remote command (~$150k/year) (#17).
Research And Monitoring $900K/yr
[#14, #21] Ontokinetic/astral tracking project and associated field/contractor costs (projectized recurring scope) (#14) and incident forensics/outsourced lab analysis per manifestation (#21).
Contingency Reserve Replenishment $250K/yr
[#20] Annual replenishment contribution to the contingency/emergency reserve pool established one-time.
Supplies And Consumables $210K/yr
[#2, #5, #11, #12, #13] Ongoing ward maintenance reagents and contracted ritualist time (#2 recurring), medication/therapy and inpatient/med-evac buffer (#5 recurring), consumable incident-kit resupply based on ~5 incidents/yr (#11 recurring), PPE replacements and wearable health-monitor maintenance (#12 recurring), and frequent equipment replacement/damage allowance for corrupted electronics (#13 recurring).
Hazard Pay And Retention $200K/yr
[#4, #23] Training, hazard pay uplift for security/onsite staff and retention/rotation bonuses to avoid burnout (includes #4's training/hazard component and broader retention pool #23).
Facilities Maintenance $108K/yr
[#7, #9, #10, #16, #22] Archival/off-site storage maintenance and offsite vault costs (#7 recurring), additional HVAC/energy costs to manage cold events (#9 recurring), generator/UPS fuel & maintenance (#10 recurring), secure storage vault ongoing security/storage fees (#16 recurring), and communications hardening maintenance (#22 recurring).
Cover Story And Legal $85K/yr
[#18] Legal/cover-story, NDAs, coordination with local authorities/false-front maintenance, and PR buffer for leak mitigation.
Logistics And Transport $60K/yr
[#24] Cross-site secure transport (armored vans/escorts), frequent movement between Site-120 and Site-300, and related travel/fuel costs.
Training And Drills $40K/yr
[#19] Regular cross-department drills (security, research, medical), overtime, and training materials.
Cost Scenarios
📊 Baseline (baseline) $3.3M/yr
68.0% probability / year
Normal year with regular monitoring, no major incidents; scheduled R&D and maintenance continue.
no major manifestations outside normal pattern scheduled maintenance and research continue
🚨 Minor Incident $3.5M/yr
25.0% probability / year +$150K vs baseline
One or more localized manifestations requiring emergency response, consumable resupply, overtime, and minor equipment replacements.
localized manifestation near Director corruption of several sensors/equipment minor staff injuries requiring medical and overtime
🚨 Major Breach $4.2M/yr
5.0% probability / year +$850K vs baseline
Significant containment breach or high-severity manifestation causing equipment loss, large-scale forensics, relocation of Director, and PR/legal escalation.
widespread sensor corruption and equipment loss serious personnel casualties or security breach forced Director relocation/temporary site shutdown
🚨 Research Breakthrough Requiring Scale Up $5.3M/yr
2.0% probability / year +$2.0M vs baseline
R&D yields a lead that requires rapid scale-up: large field expeditions, artifact procurement, and multi-year project funding.
promising ontokinetic tracking results need for large-scale contractor/artifact procurement
👥 Personnel 17 total
Role Count Notes
Research Scientist / Thaumaturgist 5 [#3] Senior thaumaturgist (1), two ontokinetics researchers (2), and two research assistants (2) forming the specialized thaumaturgy/ontokinetics team referenced in salary estimates.
Security Officer / MTF Agent 10 [#4] 24/7 security presence (8–12 guards across 3 shifts); modeled as 10 guards for budgeting and staffing rotations.
Medical Officer 1 [#5] Full-time clinical psychologist/psychiatrist dedicated to Director Requet and on-call medical support.
Remote Operations / Administrative Staff 1 [#17] Ongoing remote-operations staffing for relocation/remote command and administrative coordination.
📋 Confidence Notes
Many items are broad ranges and several costs (R&D, artifact procurement, contingency reserve sizing) have high uncertainty; SCP is anomalous and behavior is not fully predictable, reducing confidence in precise estimates.
← SCP-6743 ↑ All SCPs SCP-6745 →