SCP-6785
Humanoid/Artefact
~
medium confidence
SCP-6785
Expected annual
$2.4M
One-time setup
$2.1M
Annual recurring
$2.2M
Personnel
42
Estimated one-time setup and fit-out costs are approximately $2.13M driven by containment cell modifications, equipment, and contingency reserves; ongoing annual operations are about $2.25M/yr driven by security staffing, dedicated research salaries, cover-story/restaurant operations, and contingency contributions.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $2.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.2M/yr
Normal operational year with no major incidents; routine containment, research, and cover operations only.
no breaches
routine operations
scheduled audits and drills
🚨
Minor Incident
$2.4M/yr
Localized fuel leak, small spill, or minor hostile activation requiring cleanup, overtime, and limited repairs.
small fuel spill
minor containment damage
targeted remediation
🚨
Major Breach
$3.8M/yr
Hostile activation or partial breach causing structural damage, injuries, legal exposure, and significant remediation.
SCP-6785-1 turbine launch within facility
significant fuel release
staff injuries and containment failures
🚨
Disposition Event
$7.2M/yr
Decision/execution of a long-term disposition or industrial-scale synthesis effort (destruction, relocation, or scaling up fuel production).
policy decision to destroy or relocate
need for industrial-scale fuel synthesis
catastrophic environmental release requiring remediation
Personnel
42 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#3] Core 24/7 guard coverage across three sites (rotations aggregated). |
| Tactical Team / Rapid Response | 6 | [#3, #16] On-call specialized tactical/hazmat response team included in security staffing estimates. |
| Research Scientist | 4 | [#25] Dedicated research leads for xenobiology, memetics, and engineering (part of research salary pool). |
| Technician | 2 | [#25] Lab/engineering technicians supporting research and sample handling. |
Confidence Notes
Analyst notes provide detailed line items and plausible ranges, allowing a reasonable mid-point estimate; however ranges are wide for several items (R&D scale, contingency reserve, breach costs), and many estimates depend on policy choices, so residual uncertainty remains.