SCP-6805
Ticonderoga1
?
low confidence
SCP-6805
Expected annual
$65.2M
One-time setup
$218.3M
Annual recurring
$59.7M
Personnel
50
Initial capital expenditures dominated by anomalous hardware, communications, secure-site construction, and a large contingency reserve (~$218M one-time). Annual operating costs (security, black ops, personnel, power, and research) are the main recurring drivers (~$60M/yr).
One-Time Capital Costs
Total: $218.3M
Annual Recurring Costs
Total: $59.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$59.7M/yr
Normal operational year with scheduled maintenance, research, diplomacy, and no major incidents.
routine_operations
scheduled_maintenance
diplomatic_activities
🚨
Minor Incident
$69.2M/yr
Localized gateway failure, probe loss, or limited breach requiring emergency repairs, temporary evacuations, and elevated covert activity.
gateway_hardware_failure
localized_contamination
probe_loss
🚨
Major Breach
$259.7M/yr
Serpent's Hand exposure, large-scale breach, or a K-Class evacuation requiring mass support, accelerated reconstruction, and emergency contingency spending.
serpents_hand_discovery
mass_evacuations
K-Class_activation
Personnel
50 total
| Role | Count | Notes |
|---|---|---|
| Liaison Officer / Multiversal Coordinator | 10 | [#1] Small permanent liaison and coordination team responsible for MoU maintenance, counterpart scheduling, and K-Class coordination. |
| Research Scientist | 15 | [#10, #16] Researchers for mapping/topology/exit mechanics and probe analysis; included in recurring research budget. |
| Security Officer / MTF Agent | 12 | [#6, #14] Security and counter-intelligence personnel and rapid-response team members for gateway/site protection and clandestine operations. |
| Engineer / Maintenance | 5 | [#2, #3, #11, #12] Engineers to build/maintain gateway hardware, communications, anchors, and power systems. |
| Medical Officer | 3 | [#17, #20] Medical and decontamination staff to operate quarantine, diagnostics, and reintegration support. |
| Administrative Staff | 5 | [#4, #18, #19] Site administration, archive/data custodians, legal liaison, and operational admin support. |
Confidence Notes
Cost ranges and program scope depend heavily on uncertain tech maturity (portal/comm tech), negotiated obligations with SCP-6805 administration, and the secrecy posture vs the Serpent’s Hand; many items are wide ranges and contingent on policy choices.