SCP-6806
Euclid
~
medium confidence
SCP-6806
Expected annual
$1.9M
One-time setup
$1.0M
Annual recurring
$1.8M
Personnel
6
Initial capital outlay is moderate (~$1.02M) driven by secure video hardware and storage; annual operating costs are larger (~$1.82M/yr) driven by staffing, research/monitoring, MTF readiness, legal/cover budgets, and standing secrecy reserves. Episodic large breaches can generate additional costs in the hundreds of thousands to millions.
One-Time Capital Costs
Total: $1.0M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal operational year with no major containment breach; standard monitoring, maintenance, and reserves funded.
no incidents
standard operations
🚨
Minor Incident
$1.9M/yr
Single localized manifestation on a remote vessel or field site requiring one MTF deployment, limited amnestics, evidence preservation and legal takedowns.
single-vessel manifestation
small MTF deployment
limited civilian witness treatment
🚨
Major Public Compromise
$3.3M/yr
Widespread public/or multi-site manifestation requiring mass amnestic operations, national PR campaign, large MTF mobilization, and extensive legal actions.
widespread broadcast manifestation
mass witness exposure
national legal/PR response
🚨
Dedicated Committee Scaleup
$2.4M/yr
Policy decision to staff a dedicated containment committee (hire 12 FTE watchers) instead of rotating stipends, increasing recurring personnel costs significantly.
policy: hire dedicated watchers
increased on-site staffing requirement
Personnel
6 total
| Role | Count | Notes |
|---|---|---|
| Video-forensics Analyst | 1 | [#7] Full-time operator to review flagged footage, maintain logs, and verify chain-of-custody. |
| Security Officer / MTF Agent | 2 | [#9] Two additional on-site guards recommended to secure break room and immediate containment area (with benefits included in wages). |
| Containment Committee Watchers (active) | 3 | [#8] At least three individuals must watch weekly (active concurrent watchers); baseline uses rotating stipend model so 3 are present at a time. |
Confidence Notes
Mid-range confidence: many line items have well-defined enterprise cost ranges (hardware, staffing, storage), but probabilities and severity of episodic public-compromise events are highly uncertain and anomalous behavior could change requirements.