SCP-6808
Unknown
~
medium confidence
SCP-6808
Expected annual
$5.2M
One-time setup
$5.8M
Annual recurring
$4.8M
Personnel
18
Initial capital and setup are large due to property acquisition, a custom Phasma‑Faraday Shield (PFS) and equipment buildout (approx. $5.76M one‑time). Recurring operations are driven by staffing, R&D and energy/maintenance for the PFS (~$4.85M/yr baseline), with incident years adding substantial repair/cover costs.
One-Time Capital Costs
Total: $5.8M
Annual Recurring Costs
Total: $4.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.8M/yr
Normal, uneventful year with containment maintained, no major breaches; recurring operations run as planned.
stable PFS operation
no major structural failures
standard training and R&D cadence
🚨
Minor Incident
$5.1M/yr
One or more minor leak events requiring elevated repairs, extra cover operations and increased spare part usage.
minor Phasma leaks
increased structural repairs
heightened cover/PR activity
🚨
Major Breach
$6.3M/yr
Large containment failure or destructive leak causing major structural collapse, emergency PFS replacement/repair and significant cover/settlement costs.
runaway phasmic leak
structural collapse
widespread civilian exposure
Personnel
18 total
| Role | Count | Notes |
|---|---|---|
| Operators / PFS Technicians | 6 | Skilled operators responsible for PFS maintenance and daily monitoring (specialized tech pay band). |
| Engineer / Maintenance | 3 | Mechanical/electrical engineers and on‑call technicians for PFS, generators and site systems. |
| Civilian‑Façade Personnel | 5 | Staff maintaining civilian inhabitant facade and daily presence (general staff pay band). |
| Supervisor / Site Lead | 1 | Site supervisor responsible for operations, escalation and liaison with Foundation command. |
| Administrative Staff | 1 | Payroll, bookkeeping and covert corporate maintenance. |
| Medical Officer | 1 | On‑call medical staff for amnestic administration and staff health. |
| Research Scientist / Liaison | 1 | R&D liaison coordinating external research contracts and data analysis. |
Confidence Notes
Analyst notes provide detailed line items and ranges enabling structured estimates, but many items (PFS complexity, frequency of leak events, R&D scale and property choice lease vs purchase) are uncertain and can materially change totals; hence medium confidence.