SCP-6820
Perfect
~
medium confidence
SCP-6820
Expected annual
$743.5M
One-time setup
$5.8B
Annual recurring
$673.0M
Personnel
220
One-time capital costs dominated by large contingency reserves, land acquisition for a 50-km exclusion zone, and specialized destruction / procurement programs (~$5.8B). Recurring annual costs are dominated by exclusion-zone operations, contingency fund allocations and classified overhead (~$673M/yr).
One-Time Capital Costs
Total: $5.8B
Annual Recurring Costs
Total: $673.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$673.0M/yr
Normal year with no major incidents; standard operations, maintenance, research and security activity.
no major breaches
steady-state operations
routine maintenance
🚨
Minor Incident
$678.0M/yr
Localized breach/incident requiring emergency response, limited remediation, amnestic distribution and short repairs.
small containment failure
localized memetic exposure
limited environmental contamination
🚨
Major Breach
$1.2B/yr
Significant containment breach with structural damage, widespread contamination or loss of some exclusion-zone control requiring major repairs and legal/diplomatic payouts.
large structural failure
major memetic spread
loss of multiple sink units
🚨
Catastrophic Breach
$5.7B/yr
CK-class or near-CK-class escalation requiring global response, mass amnestics, activation/liquidation of contingency fund and emergency international operations.
site-wide RAGE-STATE / multiple sink failures
uncontrolled ontokinetic propagation
need for global-scale emergency measures
Personnel
220 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 100 | [#11] On-site security workforce (50–150 personnel). Count chosen near midpoint; wages included in staff_wages. |
| Research Scientist | 75 | [#12] Research staff supporting long-term R&D and monitoring; portion of research salaries included in staff_wages. |
| High-grade Personnel (Memeticists / Engineers / Level 4/5) | 45 | [#13] Senior technical staff, memeticists and engineers (30–60 senior staff); counts chosen to align with salary budget. |
Confidence Notes
Estimates use midpoints from wide analyst ranges and a conservative split of recurring vs one-time amounts. Many line items are jurisdiction-dependent, contingent (political/legal actions, black programs, catastrophic reserves) or intentionally classified, producing wide uncertainty; numbers are order-of-magnitude estimates informed by the detailed analyst notes.