SCP-6826
Euclid
✓
high confidence
SCP-6826
Expected annual
$1.8M
One-time setup
$1.8M
Annual recurring
$1.8M
Personnel
16
Initial one-time setup is approximately $1.79M driven by enclosure construction, lab fit-out, and contingency reserves; recurring annual costs are about $1.81M driven primarily by staff wages, security, lab consumables, and ongoing maintenance.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $1.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.8M/yr
Normal operational year with no major incidents; routine maintenance, staffing, consumables, and planned research activities only.
no breaches or contamination events
scheduled maintenance and routine research
🚨
Minor Incident
$1.9M/yr
Limited contamination or medical incident requiring extra testing, targeted remediation, short-term staffing overtime and modest repairs.
localized contamination of containment water
staff exposure requiring treatment and extra sequencing/testing
minor equipment failure (pump/camera)
🚨
Major Breach
$2.8M/yr
Significant contamination or partial breach requiring external contractors, public health coordination, large-scale remediation, use of contingency funds, and legal response.
seepage to external drains or public exposure
mass staff infections or sustained environmental contamination
large-scale structural repairs or replacement
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | [#7] Dr. Kyle Sands plus ~2 additional senior researchers for experiments, monitoring, and oversight. |
| Research Technician | 3 | [#7] Laboratory technicians for sample processing and routine BSL-2 work. |
| Security Officer / MTF Agent | 7 | [#8] 24/7 trained guards covering three shifts. |
| Security Supervisor | 1 | [#8] On-site security supervisor. |
| Medical Officer | 1 | [#9] Part-time physician/occupational health oversight (on-call basis). |
| Nurse / Medical Staff | 1 | [#9] Occupational health nurse for immediate treatment and follow-up. |
Confidence Notes
Analyst notes provide detailed line items and ranges for construction, equipment, staffing and operations; most costs are tangible and based on typical institutional pricing. Remaining uncertainty arises from site-specific construction variance and optional research scale.