SCP-6836
Unknown
~
medium confidence
SCP-6836
Expected annual
$4.4M
One-time setup
$8.6M
Annual recurring
$4.2M
Personnel
37
Estimated one-time startup costs are approximately $8,630,000 driven by property purchase options, contingency reserves and heavy initial equipment; recurring annual costs are approximately $4,227,000/yr driven primarily by continuous MTF staffing, specialist research wages, off-site monitoring and ongoing legal/cover operations.
One-Time Capital Costs
Total: $8.6M
Annual Recurring Costs
Total: $4.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.2M/yr
Normal year with routine operations, monitoring, scheduled tests within safe parameters and no public incidents.
routine monitoring
scheduled testing
no public exposures
🚨
Minor Incident
$4.9M/yr
Localized public exposure or small containment event requiring elevated amnestics, repairs and PR/legal action.
small public sighting
equipment damage
localized leak requiring amnestics
🚨
Major Breach
$14.2M/yr
Significant containment failure or fusion/energetic event (or large-scale public disclosure) requiring major emergency remediation, legal settlements and large-scale engineering response.
partial fusion/energetic event
large-scale public casualty/damage
failed decommissioning attempt
Personnel
37 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | 12–18 per location rotation to provide continuous coverage and leave allowances; includes field agents and cordon teams. [#6] |
| Research Scientist | 6 | Senior physicists, anomaly researchers and analysts for modelling and experiment design. [#10, #9, #26] |
| Engineer / Maintenance | 3 | Site engineers for containment cell, shield maintenance, generators and remote rigs. [#1, #13, #14] |
| Medical Officer | 1 | On-call medical/hazmat support and long-term monitoring coordination. [#12, #20] |
| Administrative Staff | 2 | Logistics, scheduling, procurement and cover story coordination. [#16, #23] |
| Site Director / Executive Staff | 1 | Overall program oversight and command liaison. [#3, #9] |
Confidence Notes
Estimates are based on detailed analyst line items (MTF staffing, off-site monitoring, equipment and contingency reserves) but ranges are wide and the anomaly's behavior is partially unknown; core recurring costs are well-constrained while catastrophic reserves are highly uncertain.