SCP-6837
Unknown
~
medium confidence
SCP-6837
Expected annual
$1.3M
One-time setup
$5.0M
Annual recurring
$1.3M
Personnel
20
Estimated one-time setup and acquisition costs are approximately USD 4.96M (driven primarily by property acquisition, contingency reserve, and possible demolition/retrofit), with recurring annual costs of roughly USD 1.28M/yr driven mainly by staff wages (security, monitoring, research) and emergency/insurance overhead.
One-Time Capital Costs
Total: $5.0M
Annual Recurring Costs
Total: $1.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.3M/yr
Normal operational year with no significant incidents; containment and research continue at planned staffing and maintenance levels.
steady monitoring
routine maintenance
no escalation
🚨
Minor Incident
$1.4M/yr
Localized incident requiring emergency response, short-term repairs, increased legal/PR activity and limited settlements.
unauthorized access
localized harm to residents
small-scale equipment damage
🚨
Major Breach
$3.3M/yr
Severe escalation requiring evacuation, demolition or large-scale remediation, major litigation and reconstruction.
widespread public exposure
structural failure
large-scale health effects
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 7 | [#7] 24/7 on-site security coverage (6–8 FTE typical). |
| Monitoring Staff / CCTV Operator | 3 | [#9] Continuous feed monitoring and incident response (shift coverage). |
| Research Scientist | 4 | [#12] Acoustic scientists/physicists leading analysis and experiments (2–5 researchers). |
| Field Technician | 2 | [#13] Field techs for rigs, calibration and on-site instrumentation. |
| Program Manager / Executive Staff | 2 | [#27] Program management, finance and HR for long-term administration. |
| Engineer / Maintenance | 1 | [#14, #15] Maintain active suppression systems, site HVAC and soundproofing elements. |
| Evidence Archivist / Custodian | 1 | [#20] Evidence cataloging, chain-of-custody and archive management. |
Confidence Notes
Analyst notes provide detailed line items and ranges allowing a mid-range estimate, but major uncertainties remain (building condition, exact number of residents displaced, technical scope of suppression and legal outcomes), so confidence is medium.