SCP-6842
Unknown
~
medium confidence
SCP-6842
Expected annual
$1.1M
One-time setup
$758K
Annual recurring
$1.1M
Personnel
9
Initial capital costs are approximately $758,000 driven by a fireproof containment suite, exhaust/filtration systems, surveillance and R&D setup; annual recurring costs are about $1,060,500/yr driven primarily by staff wages (handlers, vet, agent, security), ongoing research/monitoring, and security/administrative overhead.
One-Time Capital Costs
Total: $758K
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with routine monitoring, no escapes or major combustion incidents.
no escapes
routine monitoring
no combustion events
🚨
Minor Incident
$1.1M/yr
Single escape attempt or isolated combustion event requiring forensic analysis, small repairs, overtime and consumable replacement.
escape attempt
single combustion requiring forensics
minor infrastructure damage
🚨
Major Breach
$1.9M/yr
Significant containment breach with facility damage, large-scale combustion damage, public exposure and major forensic/legal response.
full containment breach
facility fire/damage
public exposure requiring legal action
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#9] 24/7 on-site security rotation (four guards) to maintain suite security and initial recapture response. |
| Animal Handler | 1 | [#6] One full-time trained handler experienced with working dogs and anomaly-aware protocols. |
| Research Scientist | 1 | [#13] Scientist responsible for metamorphosis/genetics/proteomics research and data analysis. |
| Veterinary Officer | 1 | [#7] Dedicated veterinary support (part-time/contract) for exams, treatment and anesthesia planning. |
| Agent / MTF Point-of-Contact | 1 | [#8] Senior assigned agent (Agent/MTF POC) for oversight, case management and liaison with MTF-Omicron-1. |
| Administrative Staff | 1 | [#30] Administrative/program support for procurement, scheduling, permitting and documentation. |
Confidence Notes
Many line items have published ranges and event frequencies are uncertain (combustion events and escape likelihood). Capital items and personnel costs are reasonably well-specified; contingency around incident frequency and scale keeps overall confidence at medium.