SCP-6884
Unknown
~
medium confidence
SCP-6884
Expected annual
$10.0M
One-time setup
$36.9M
Annual recurring
$9.6M
Personnel
42
Initial capital buildout is large (~$36.9M) driven by reinforced enclosures, sensor network deployment and a contingency reserve; ongoing annual costs are substantial (~$9.63M/yr) dominated by staff wages (MTF & embedded agents), research/monitoring, and legal/cover operations.
One-Time Capital Costs
Total: $36.9M
Annual Recurring Costs
Total: $9.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$9.6M/yr
Normal operational year with active monitoring, regular captures and no major containment incidents.
routine field operations
scheduled surveys
no major breaches
🚨
Minor Incident
$10.4M/yr
Localized escape, small brood discovery or targeted remediation requiring extra field operations, legal actions and ad-hoc deployments.
single-site containment breach
capture & limited remediation
heightened PR/legal activity
🚨
Major Breach
$34.6M/yr
Widespread brood discovery or uncontrolled tunnelling leading to large-scale remediation, mass capture/neutralization campaigns and extensive cover operations.
discovery of multiple broods
large-scale tunnelling across properties
political/public exposure requiring national response
Personnel
42 total
| Role | Count | Notes |
|---|---|---|
| Embedded Agent / Field Operative | 6 | [#1] Agents embedded in local law enforcement to intercept reports and manage witnesses (4–8 estimated; 6 used here). |
| Security Officer / MTF Agent | 24 | [#2] Rotating MTF personnel (Gamma-4 & Zeta-9) for rapid response and cave operations; 24 personnel coverage as given in analyst notes. |
| Research Scientist | 4 | [#11] Research staff for taxonomy, genetics, imaging and behavioural studies included in recurring research budget. |
| Veterinary Staff / Animal Care Technician | 3 | [#10] Veterinary and animal-care technicians for captive individuals and medical needs (2–4 estimated; 3 used here). |
| Engineer / Maintenance | 2 | [#3, #5] Engineers and maintenance personnel for vehicles, remote equipment and facility systems. |
| Administrative Staff | 2 | [#14, #15] Administrative/cover-story and legal support staff for PR, witness management and permit/legal tasks. |
| Site Director / Executive Staff | 1 | [#8, #11] Senior site/executive oversight for containment policy, budgets and interagency coordination. |
Confidence Notes
Estimates are built from analyst-provided ranges and operational assumptions (enclosure counts, staff headcounts, and chosen midpoints). The SCP has concrete operational details (site procedures, MTF rotations) but many costs are range-based and contingent on incident scale, so confidence is medium.