SCP-6906 Unknown ? low confidence
SCP-6906
Expected annual
$633K
One-time setup
$1.8M
Annual recurring
$607K
Personnel
4
One-time setup and hardening are approximately $1.76M driven primarily by property acquisition and potential containment buildout; recurring operations are about $606.6k/year driven by staff wages, contracted security, and research/monitoring.
🏗️ One-Time Capital Costs Total: $1.8M
Facilities $1.4M
[#1, #2, #6, #7, #26] Purchase of SCP-6906 property and adjacent residence (chosen purchase option), structural hardening and perimeter fencing, plus contingency long-term containment buildout budget.
Equipment $204K
[#2, #8, #9, #10, #11, #12, #13, #14, #17, #18, #22, #24] CCTV/surveillance installation, generator/UPS, local server/hardware, sensors, robotics/inspection gear, specialized imaging, mobile kits, decontamination kit, PPE procurement, vehicle purchase, secure evidence storage, and furnishings for cover residence.
Contingency Reserve $100K
[#27] One-time contingency reserve for unforeseen capital or expedited needs (~10–30% guideline).
Initial Research And Lab Setup $30K
[#12, #13, #14, #15] Initial research/lab buildout and specialist instrument budget to support early analysis and custom robotics R&D.
Cover Identity Setup $10K
[#3] One-time shell-company formation, anonymization/legal fees, initial fake records and setup for cover identity.
Legal And Pr One Time $10K
[#20] One-time legal/municipal/PR expenses for initial transactions, permits, or neighbor compensation.
🔄 Annual Recurring Costs Total: $607K/yr
Staff Wages $360K/yr
[#4] Staffing for one full-time on-site agent plus rotation staff (4 FTE total at ~$90k/FTE assumed).
Research And Monitoring $100K/yr
[#14, #15, #25] Research personnel/external contracts (partial FTEs), per-mission lab analyses and project budgets (expected annual campaign budget).
Local Security $50K/yr
[#5] Contracted guard or rapid-response coverage (1 guard equivalent assumed).
Contingency Fund Recurring $30K/yr
[#27] Recurring contingency reserve (approx. 10–30% guidance applied to operational budget).
Incident Missions $20K/yr
[#25] Expected annual budget for authorized entry/experiment missions (typical field missions, equipment rental, overtime).
Medical Monitoring $10K/yr
[#16] Routine psychological screening and medical follow-up for monitoring exposed personnel.
Facilities Maintenance $8K/yr
[#7, #21, #23] Perimeter/fencing upkeep, property taxes and utilities, routine groundskeeping and seasonal work (snow removal).
Logistics And Transport $8K/yr
[#9, #19, #22] Vehicle fuel/maintenance/insurance, extra electricity/fuel for backup systems, periodic evacuation/drill logistics.
Cover Story And Legal $8K/yr
[#3, #20] Ongoing cover identity maintenance, legal retainer and PR management to handle municipal inquiries.
Data And Cybersecurity $6K/yr
[#8, #10] Cloud storage, encrypted comms, VPNs, off-site backups and IT monitoring/administration.
Supplies And Consumables $4K/yr
[#11, #18, #24] Sensor calibration/consumables, PPE re-supply, minor evidence-storage consumables.
Decontamination Response $2K/yr
[#17] Recurring supplies/training reserve for minor decontamination responses; per-incident major costs budgeted separately.
Evidence Storage $600/yr
[#24] Climate control/secure storage rental and maintenance for logs and evidence.
Cost Scenarios
📊 Baseline (baseline) $607K/yr
90.0% probability / year
Normal operational year with routine monitoring, no major incidents.
routine_surveillance scheduled_missions no_major_incident
🚨 Minor Incident $637K/yr
8.0% probability / year +$30K vs baseline
A single investigation/entry mission causes equipment loss or a personnel exposure requiring medical/PR response.
investigation_mission minor_personnel_exposure equipment_damage
🚨 Major Breach $1.8M/yr
2.0% probability / year +$1.2M vs baseline
Escalation requiring emergency containment buildout, major medical response, or public exposure mitigation.
fatalities_on_site wider_influence public_detection
👥 Personnel 4 total
Role Count Notes
On-site Agent 1 [#2, #4] Single full-time agent residing in neighboring property to perform continuous monitoring and cover duties.
Research / Rotation Staff 3 [#4] Rotational monitoring staff (bi-weekly rotations) providing continuous coverage; totals align with staff_wages FTE estimate.
📋 Confidence Notes
Costs are imprecise due to the anomalous nature of SCP-6906 (psychological effects, failed sampling) and wide ranges provided for robotics/R&D, containment buildout, and incident response; many line items are contingent on uncertain technical progress.
← SCP-6905 ↑ All SCPs SCP-6907 →