SCP-6908
Neutralised
~
medium confidence
SCP-6908
Expected annual
$233K
One-time setup
$204K
Annual recurring
$231K
Personnel
2.5
One-time acquisition and contingency/exhumation expenses drive initial costs (~$204k), while recurring yearly costs are dominated by embedded staff wages and ongoing research/monitoring (~$231k/year). Main risk drivers are potential reactivation or decommissioning which could add tens to hundreds of thousands in a response year.
One-Time Capital Costs
Total: $204K
Annual Recurring Costs
Total: $231K/yr
Cost Scenarios
📊
Baseline
(baseline)
$231K/yr
Normal, uneventful year with routine monitoring, letter collection at low frequency, and standard staffing levels.
no reactivation
routine letter frequency
no incidents
🚨
Minor Incident
$246K/yr
Vandalism, trespass, or localized incident requiring temporary increased security, repairs, and additional forensic work.
vandalism
trespass/tampering
localized equipment damage
🚨
Major Reactivation
$381K/yr
Anomalous reactivation or a letter/event that requires full emergency response: rapid-deploy team, emergency lab time, temporary sealing and elevated security.
reactivation of anomalous effects
dangerous letter manifestation
sudden spread or escalation
🚨
Decommissioning Or Exhumation
$311K/yr
Planned or compelled exhumation and transfer to Foundation facility or long-term secure storage with associated legal/transport containment work.
court order or escalation
decision to recontain
evidence of persistent hazard requiring removal
Personnel
2.5 total
| Role | Count | Notes |
|---|---|---|
| Groundskeeper / Caretaker | 1 | [#4] Routine maintenance, weekly inspections, letter collection and initial reporting. |
| Embedded Foundation operative / Site Liaison | 1 | [#5] Trained Foundation staff embedded nearby to receive reports, coordinate transfers to labs, and liaise with caretakers. |
| Security Officer / MTF Agent (part-time) | 0.5 | [#6] Periodic security checks and remote monitoring; modeled as a part-time presence. |
Confidence Notes
Notes provide concrete cost ranges for most line items and the object's Neutralised status reduces uncertainty; however regional variability for land purchase, the random letter frequency, and low-probability high-cost escalation events leave some uncertainty.