SCP-6952
Unknown
?
low confidence
SCP-6952
Expected annual
$8.7M
One-time setup
$38.3M
Annual recurring
$8.0M
Personnel
38
One-time capital and contingency requirements are dominated by large contingency/reserve funds and escalation-capable infrastructure (totaling tens of millions). Baseline recurring operations are driven by personnel (MTF + researchers), maintenance, training, and legal/cover operations (~$8.0M/yr).
One-Time Capital Costs
Total: $38.3M
Annual Recurring Costs
Total: $8.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.0M/yr
Normal operational year with no major incidents: routine research, maintenance, training, deployments within expected tempo.
routine_operations
scheduled_training
minor_research_projects
🚨
Minor Incident
$8.6M/yr
Localized recovery or exposure requiring a single-site recovery, amnesticization, modest remediation and a cover-up.
field_discovery_by_civilians
small_recovery_site_remediation
single_cover-up_event
🚨
Major Breach
$18.0M/yr
Large-scale exposure or proliferation event requiring multi-site recovery, large remediation, legal settlements, replacement of capital equipment and emergency scale-up.
widespread_proliferation
high-profile_leak_or_breach
multiple_simultaneous_recovery_operations
Personnel
38 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#4] Omega-45 tactical unit operators responsible for carrying, recovering, and scuttling SCP-6952-1. |
| Research Scientist / Technician | 6 | [#5, #6] Level-4+ researchers and materials scientists for R&D into SCP-6952-1 schematics and SCP-6952-2 characterization. |
| Engineer / Maintenance | 2 | [#6, #14] Facility and fabrication shop engineers maintaining testing rigs, fabrication equipment and transport. |
| Armorer / Maintenance Tech | 2 | [#12, #4] Weapon maintenance and armorer staff for servicing anomalous/mundane components. |
| Medical Officer | 2 | [#16] Advanced trauma care and medevac support for high-risk operations. |
| Administrative Staff | 2 | [#11, #18, #29] Inventory/logistics administration, Ethics Committee coordination, and cross-site administrative overhead. |
Confidence Notes
Estimates are based on wide ranges in analyst notes and numerous contingent/incident-driven costs for an anomalous weapon-manufacturing/containment program; many line items (frequency of incidents, scale of remediation, reserve drawdowns) are highly uncertain.