SCP-7012
Thaumiel
~
medium confidence
SCP-7012
Expected annual
$23.5M
One-time setup
$157.8M
Annual recurring
$22.9M
Personnel
67
Estimated one-time capital costs are approximately $157.8M dominated by Akiva siphon R&D/installation and related heavy structural/SRA retrofits; annual recurring operations are about $22.9M driven by specialized engineering, security, counter-memetic programs and amnestic/supplies.
One-Time Capital Costs
Total: $157.8M
Annual Recurring Costs
Total: $22.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$22.9M/yr
Normal operational year with weekly maintenance, regular research, security posture and no major incidents.
routine_maintenance
scheduled_research
no_breach
🚨
Minor Incident
$23.9M/yr
Localized malfunction or attempted intrusion requiring emergency repairs, temporary heightened security and limited public mitigation.
equipment_failure
small_breach_attempt
🚨
Major Breach
$72.9M/yr
Significant containment breach or credible exposure event forcing emergency neutralization/decommissioning, large-scale remediation, legal settlements and PR operations.
large_scale_breach
forced_decommissioning
Personnel
67 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 40 | [#14] Armed guards and continuous security detail assigned to SCP-7012; headcount reflects round-the-clock shifts and rapid-response standby. |
| Engineer / Maintenance | 8 | [#13] Skilled engineers and technicians operating and maintaining Akiva siphons (part of O&M team). |
| Research Scientist | 10 | [#16] Physicists, memeticists and thaumaturgists assigned to permanent Akiva research program. |
| Medical Officer | 1 | [#11] On-site medical staff to verify amnestic efficacy and perform health checks. |
| Containment Technician | 2 | [#9] Level-cleared technicians performing weekly inspections and maintenance (rotating FTEs). |
| Intelligence / Counter-memetic Analyst | 6 | [#15] Personnel dedicated to counter-memetic/counter-religious operations and HUMINT/cyber interdiction. |
Confidence Notes
Analyst notes provide detailed line items and ranges, allowing reasonable mid-point estimates, but wide ranges on Akiva R&D, siphon build cost and decommissioning produce substantial uncertainty; classification and classified vendor premiums add further variance.