SCP-7020 Euclid ? low confidence
SCP-7020
Expected annual
$403.9M
One-time setup
$44.2B
Annual recurring
$187.5M
Personnel
50
Initial capital outlays are large (~$44.2 billion) driven primarily by telescope hardware, communications infrastructure, and probe R&D/manufacturing; recurring annual costs are moderate (~$167.5M/yr) driven by operations, data handling, security, and influence/suppression activities.
🏗️ One-Time Capital Costs Total: $44.2B
Probe Manufacturing Per Probe $20.0B
[#13] Per-probe manufacturing & launch cost (per-probe capital if a build is authorized).
Equipment $11.5B
[#1, #2, #4] Orbital Telescope 47A build & launch, instrumentation upgrades, and redundancy/backup observatory assets (one-time capital hardware).
Probe Rd Program $10.0B
[#12] Mk. VII unmanned probe R&D program (anomalous/accelerated-tech assumption midpoint estimate).
Deep Space Communications $2.0B
[#14] Deep-space communications infrastructure build (large radio/laser arrays and signal-processing backends).
Contingency Reserve $500.0M
[#23] One-time contingency reserve for surge response / rapid expansion if SCP activity increases.
Initial Research And Lab Setup $50.0M
[#28] Initial program funding and instrument/lab setup for passive-observation research (neutrino/GW/etc.)
Legal Risk Reserve $50.0M
[#27] One-time liability reserve for legal/insurance settlements, indemnities and contingency lawsuits.
Rapid Response Reserve $30.0M
[#20] Rapid-response financial reserve (one-time component of leak/fast-response capability).
Facilities $20.0M
[#6] Secure analysis facility (SCIF) buildout one-time cost estimate.
Data Infrastructure $20.0M
[#5] One-time servers and on-premises secure storage buildout for petabyte-scale archival and HPC.
Legacy Accounting Establishment $20.0M
[#30] Establishment costs for long-duration custody, trust/fund mechanisms and legacy accounting.
Public Relations Reserve $20.0M
[#26] One-time urgent public-relations / crisis-campaign reserve for acute misinformation mitigation.
Cover Finance Setup $5.0M
[#17] Legal structure, shell entities and cover financing setup costs (one-time).
Cyber Penetration Initial $3.0M
[#11] Initial cyber-penetration / covert-access engagement to telescope/observatory archives.
Classified Archive Backups Initial $3.0M
[#21] Initial physical cold-storage and hardened-archive buildout (tape/optical vaults).
Embedded Operatives Setup $2.0M
[#9] Initial identity/cover establishment and setup for embedded operatives in civilian agencies.
Secure Communications And Cyber Initial Tooling $1.5M
[#8] Initial tooling for information-security program (air-gap tooling, secure comms, cyber tools).
🔄 Annual Recurring Costs Total: $187.5M/yr
Telescope Operations And Mission Support $30.0M/yr
[#3] Flight-control, mission operations, ground-station time, attitude control and routine mission support.
Depreciation Replacement Reserve $30.0M/yr
[#25] Annual replacement / refresh reserve for space hardware, compute clusters and ground equipment.
Data Scrubbing And Influence Operations $20.0M/yr
[#10] Ongoing data-suppression, legal/PR payoffs, journal influence and covert payments to sanitize results.
Probe Mission Support $20.0M/yr
[#15] Long-term mission command, telemetry analysis and operations staffing for any deployed probes.
Foreign Liaison Payments $20.0M/yr
[#19] Quiet agreements/payments to international agencies/observatories to coordinate data handling.
Data Storage And Hpc Cloud $12.0M/yr
[#5] Recurring cloud/HPC/storage and high-throughput link costs for analysis and archival operations.
Staff Wages $7.5M/yr
[#7] Salaries for scientific, engineering and operations staff (typical baseline: ~50 staff × $150k fully-burdened).
Cover Story And Legal $6.0M/yr
[#17, #18] Ongoing cover-finance/legal overhead and directed cover-story research grants (combined ongoing estimate).
Information Security Program $6.0M/yr
[#8] 24/7 cyber operations, secure comms maintenance and defensive monitoring.
Deep Space Communications Ops $5.0M/yr
[#14] Recurring power, ops and maintenance for deep-space transmitters/receivers.
Energy Costs $5.0M/yr
[#16] Electricity for HPC, ground stations and high-power transmitters.
Leak Response Teams $5.0M/yr
[#20] Field leak-response, on-site suppression teams, travel and emergency legal/PR rapid actions.
Global Launch Monitoring $5.0M/yr
[#29] Continuous OSINT monitoring of launches, manifests, firms and labs for unauthorized mission activity.
Embedded Operatives Payroll $4.0M/yr
[#9] Recurring fully-burdened costs for embedded operatives placed in civilian aerospace agencies.
Public Relations And Crisis Comms $3.0M/yr
[#26] Ongoing PR, misinformation mitigation and crisis communications baseline; urgent campaign reserve is one-time.
Facilities Maintenance $2.5M/yr
[#6] Annual secure facility (SCIF) operations and maintenance.
Cyber Penetration Maintenance $2.0M/yr
[#11] Ongoing maintenance of covert access and persistent compromises of archives and logs.
Personnel Security And Counterintelligence $2.0M/yr
[#22] Vetting, polygraphs, monitoring and CI operations for personnel with access.
Continuity Planning $2.0M/yr
[#24] Ongoing multi-generational continuity, cross-training, succession and documentation maintenance.
Classified Archive Backups Ops $500K/yr
[#21] Recurring storage/media refresh and secure-archive operations costs.
Supplies And Consumables $0/yr
[]
Research And Monitoring $0/yr
[]
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $187.5M/yr
87.0% probability / year
Normal year: routine operations, data analysis, security, and cover activities with no major incidents or capital surges.
normal_operations no_major_incidents
🚨 Minor Incident $217.5M/yr
10.0% probability / year +$30.0M vs baseline
Localized data leak or small exposure requiring rapid-response teams, targeted legal/payments and emergency PR.
localized_data_leak small_public_exposure rapid_suppression
🚨 Major Breach $367.5M/yr
2.0% probability / year +$180.0M vs baseline
Significant public exposure or inter-agency discovery requiring broad legal defense, international payments, large PR campaigns and possible hardware seizures.
public_exposure international_scrutiny litigation_and_settlements
🚨 Probe Development Commitment $21.2B/yr
1.0% probability / year +$21.0B vs baseline
Decision-year to commit to active probe manufacturing/launch at scale (triggers multi-billion one-time manufacturing costs in that year).
decision_to_build_probe large_capital_commitment
👥 Personnel 50 total
Role Count Notes
Research Scientist 12 [#7] Astrophysicists and scientists performing spectral analysis and interpretation.
Data Analyst 10 [#5, #7] Data scientists and analysts running HPC/AI pipelines and archival processing.
Engineer / Maintenance 8 [#1, #2, #7] Telescope and ground/space hardware engineers for operations and upgrades.
Mission Operations / Flight Controllers 7 [#3, #15] Flight-control, mission-ops staff for Orbital Telescope 47A and probe command.
Information Security / Cyber Team 4 [#8, #11] Cyber operators maintaining secure telemetry, intrusion defense and covert access.
Administrative Staff 3 [#17] Admin, contracting and cover-finance maintenance staff.
Security Officer / MTF Agent 3 [#20, #22] Security and field rapid-response personnel for leak suppression and personnel security.
Site Director / Executive Staff 1 [#7] Senior management and program lead.
Medical Officer 1 [#7] On-staff medical officer for personnel contingency and health oversight.
Technician / Lab Assistant 1 [#5, #28] Technical support for lab/instrument operations.
📋 Confidence Notes
Estimates rely on wide-ranging, speculative analyst ranges (esp. probe R&D/manufacturing and choice of anomalous vs known-physics approaches); many line items are conditional, contingent, or subject to political/operational variability, so uncertainty is high.
← SCP-7019 ↑ All SCPs SCP-7021 →