SCP-7021
Unknown
?
low confidence
SCP-7021
Expected annual
$2.3M
One-time setup
$7.1M
Annual recurring
$2.3M
Personnel
10
Initial one-time setup plus conservative protective infrastructure and memetic countermeasures are estimated at roughly $7.08M one-time (including optional full-facility escalation); recurring annual operations are roughly $2.265M/year driven mainly by personnel, legal/cover costs, and facility operations.
One-Time Capital Costs
Total: $7.1M
Annual Recurring Costs
Total: $2.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.3M/yr
Normal operational year with no containment incidents; recurring operating costs only.
routine operations
scheduled training and maintenance
🚨
Minor Incident
$2.5M/yr
Localized incident (e.g., small memetic exposure, limited contamination, or isolated systems compromise) requiring emergency response, forensics, and temporary staffing/legal escalation.
limited containment breach
isolated memetic exposure
forensic recovery needs
🚨
Major Breach
$4.3M/yr
Significant containment failure or public exposure requiring large-scale emergency response, extensive remediation, medical treatment, major equipment/facility repair, and broad cover operations.
widespread memetic dissemination
physical breach and data leak
major public exposure
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 2 | [#5] Two dedicated researchers to run experiments and analyses. |
| Security Officer / MTF Agent | 4 | [#5] Four guards for site and secure-room security. |
| Memetics Specialist | 1 | [#5] One specialist experienced in cognitive/memetic hazards. |
| IT Specialist | 1 | [#5] One IT specialist to manage air-gapped systems and logging. |
| Medical Officer / Psychologist (part-time) | 1 | [#5, #14] Part-time psychologist/medical support for monitoring and post-exposure care. |
| Site Director / Executive Staff (part-time) | 1 | [#5] Part-time command oversight included in staffing estimate. |
Confidence Notes
Object class and properties are unspecified and potentially memetic/cognitohazardous; many cost items are precautionary estimates and optional escalation items have wide ranges, so overall cost confidence is low.