SCP-7052
Euclid
~
medium confidence
SCP-7052
Expected annual
$15.8M
One-time setup
$28.9M
Annual recurring
$14.2M
Personnel
65
Estimated one-time setup costs of roughly $28.85M for secure containment, vehicles, IT/forensics and contingency reserves; recurring annual costs ≈ $14.168M driven mainly by staff wages, cover-story/legal/media spending, monitoring and long-term scaling reserves.
One-Time Capital Costs
Total: $28.9M
Annual Recurring Costs
Total: $14.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$14.2M/yr
Normal uneventful year with regular monitoring, containment, staff wages and routine operations.
no major leaks
routine recoveries
ongoing monitoring
🚨
Minor Incident
$15.7M/yr
Localized leak or small containment breach requiring extra deployments, targeted PR/legal action and limited witness relocation.
localized public leak
single-instance escape
small viral media spread
🚨
Major Breach
$39.2M/yr
Widespread leak, multiple instances proliferate publicly or SCP-7052-1-16 remains at large, requiring large-scale media buys, international covert ops, mass relocations and deployment of contingency reserves.
mass social/media outbreak
proliferation of SCP-7052-1 instances
failure to recover high-priority instance
Personnel
65 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 30 | [#4, #24] Tactical containment and rapid-response teams; 20+ roster suggested in notes, expanded for two shifts and on-call. |
| Research Scientist | 11 | [#15, #17, #24] Behavioral and physical analysis, forensics and ongoing research staff. |
| Psychologist / Linguist / Propaganda Specialist | 6 | [#11, #13, #20] Memetic hazard mitigation, propaganda and psychographic analytics staff. |
| Digital Analyst / Moderation Staff | 8 | [#9, #20] Social-media monitoring and rapid takedown/watch team. |
| Engineer / Maintenance | 5 | [#1, #7, #21, #25] Site engineers for containment wing, power, communications and vehicle maintenance. |
| Medical Officer | 2 | [#16, #22] Medical/quarantine staff for exposed personnel and decontamination oversight. |
| Administrative Staff | 3 | [#10, #18, #28] Administrative, legal coordination and logistics support for PR/legal and witness relocation. |
Confidence Notes
Analyst notes provide many line-item ranges; however key uncertainties remain (physical vs purely memetic nature, frequency of incidents, geopolitical recovery costs). Estimates use mid-range assumptions; wide ranges on contingency and scaling reserves reduce confidence.