SCP-7055
Unknown
~
medium confidence
SCP-7055
Expected annual
$2.0M
One-time setup
$3.0M
Annual recurring
$2.0M
Personnel
20
Initial one-time setup is estimated at about $3.0M (main drivers: land control, contingency/reserve funds, covert buy‑in and equipment). Annual recurring costs are approximately $2.0M/yr driven by research staff, rapid-response readiness, insurance and covert/cover expenditures.
One-Time Capital Costs
Total: $3.0M
Annual Recurring Costs
Total: $2.0M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.0M/yr
Normal operational year with no major incidents; ongoing monitoring, maintenance, research and covert/cover operations proceed as planned.
no breaches
regular monitoring
routine maintenance
🚨
Minor Incident
$2.1M/yr
Localized public intrusion, small containment deployment, minor legal/PR response, short-term research surge.
public encroachment/tourist breach
small-scale anomalous activity requiring short RRT deployment
🚨
Major Breach
$3.1M/yr
Significant reactivation or large public exposure requiring full strike-team response, extended containment operations, major legal/PR/insurance payouts.
reactivation/resurgence
explosive public breach or political exposure
Personnel
20 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#3] 24/7 guard coverage estimate (6 guards chosen at mid-range staffing). |
| Research Scientist | 4 | [#7] Multi-disciplinary research team (botany/linguistics/psych) estimated 2–6 -> 4. |
| Acoustic Analyst / Engineer | 2 | [#6] 1–3 analysts for signal analysis chosen = 2. |
| Rapid Response / Security Team | 6 | [#14] Dedicated rapid-response strike team personnel (team size for readiness/training). |
| Site Director / Administrative Staff | 1 | [#23] Single site manager/administrative lead included in overhead. |
| Engineer / Maintenance | 1 | [#19] On-site maintenance/technical support for power, comms and equipment. |
Confidence Notes
Estimates are order-of-magnitude and based on analyst-provided ranges in EUR translated to USD; many line items (covert budget, contingency, land acquisition) have wide ranges and depend heavily on site size and political/legal choices, so confidence is medium.