SCP-7056
Unknown
~
medium confidence
SCP-7056
Expected annual
$2.7M
One-time setup
$4.3M
Annual recurring
$2.6M
Personnel
14
Initial implementation requires a multi-million-dollar one-time investment (primarily R&D, AI development, and a contingency reserve). Annual operating costs are dominated by staff wages and sustained research/monitoring, at roughly mid-single‑million USD per year.
One-Time Capital Costs
Total: $4.3M
Annual Recurring Costs
Total: $2.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.6M/yr
Normal year with routine monitoring, training, and no major crest incidents.
routine_operations
scheduled_training_and_audits
🚨
Minor Incident
$2.8M/yr
Localized unauthorized crest alteration or targeted sabotage requiring IRT response, forensics, limited mnestic/counseling and asset replacement.
unauthorized_crest_alteration
localized_memetic_effect
targeted_sabotage
🚨
Catastrophic Retirement
$8.6M/yr
Mandatory crest retirement or full neutralization leading to mass perception nullification and emergency continuity-of-operations measures.
mandatory_crest_retirement
mass_identity_nullification
temporal_anomaly_reclassification
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Incident Response Team (Security Officer / MTF Agent) | 4 | [#9] Budget and staffing estimate based on 3–6 FTEs for rapid response and replacement operations. |
| Research Scientist | 3 | [#3, #12] Memetics, AI/machine-vision and temporal research staff supporting Cliometria.aic and origin investigations. |
| Psychologist / Medical Officer | 2 | [#10] Clinicians and counselors to address disorientation, morale impacts, and mass stabilization needs. |
| Security Officer / Monitoring | 2 | [#8] CCTV/tamper-detection monitoring staff integrated with incident response. |
| Site Director / Program Manager | 1 | [#24] One program manager to coordinate the program and liaise across departments. |
| Administrative Staff | 1 | [#24] Administrative support (budget, procurement, documentation); 0.5 FTE rounded to 1 for staffing. |
| Engineer / Maintenance | 1 | [#4, #7] On-site print-shop / compute/infra maintenance and hardware support. |
Confidence Notes
Analyst-provided ranges and detailed line items allow a reasoned midpoint estimate, but memetic/temporal uncertainty, scaling with site size, and rare catastrophic outcomes reduce overall confidence.