SCP-7088 Unknown ~ medium confidence
SCP-7088
Expected annual
$1.7M
One-time setup
$4.4M
Annual recurring
$1.7M
Personnel
11
Initial capital to build an artificial cavern, life‑support, monitoring and specialist lab setup is the primary one‑time cost (~$4.4M). Annual staffing (scientists, vets, techs, security), research/monitoring, field operations and contingency reserves drive recurring costs (~$1.67M/yr).
🏗️ One-Time Capital Costs Total: $4.4M
Imperator Expansion Reserve $1.5M
[#28] One‑time reserve for rapid scale‑up if SCP‑7088‑IMPERATOR is encountered (containment modules, shielding, emergency construction).
Facilities $1.2M
[#1] Construction or retrofit of a sealed cavernous enclosure (concrete shell, artificial rock, pools, walkways, maintenance galleries, containment doors).
Equipment $790K
[#2, #3, #4, #5, #6, #11, #13, #19, #21, #26] Life‑support hardware, HVAC and humidity control units, backup generators/UPS, biosecurity hardware (airlocks, decon), monitoring/sensor array install, capture/handling kits, wastewater/bioincinerator hardware, data‑security hardening, specialist countermeasure installation, and communications/remote interaction gear.
Initial Research And Lab Setup $250K
[#7, #25] Wet lab bench and specialist instrumentation (sequencing/histology/neuro equipment) and cold‑storage/sample archive setup for voucher specimens.
Field Retrieval Procurement $200K
[#14] Procurement of off‑road vehicles, transport containers, rigging and helicopter procurement/contracting capital for field retrieval capability.
Contingency Reserve One Time $200K
[#22] Initial contingency reserve allocation for population control / emergency euthanasia/relocation setup (seed funding).
Site Access Control Procurement $100K
[#16] One‑time gating, fencing, signage and initial easement/purchase costs to block public cave access.
Security Equipment $50K
[#10] Radios, vehicles (capital portion), armoring and posted‑guard equipment procurement referenced in security staffing note.
Field Monitoring Deployment $30K
[#15] One‑time deployment cost for trail cameras, cave sensors, gating hardware and initial PIT/eDNA sensor installs in the field.
Local Stakeholder Initial $25K
[#17] Initial legal/PR setup and early compensation/engagement funds for landowners/farmers to establish cover relationships.
Legal Setup $25K
[#18] One‑time legal work and permit/contract setup required for land purchases, covert contracting and cover story foundations.
Baseline Medicals $22K
[#20] One‑time baseline medicals and screenings for on‑staff personnel (estimated ~11 staff × baseline exam).
Training Initial $15K
[#24] Initial certifications and specialized training (caving, hazardous animal handling, emergency medicine) startup costs.
🔄 Annual Recurring Costs Total: $1.7M/yr
Staff Wages $880K/yr
[#8, #9, #10] Salaries and benefits for research staff (2 scientists), veterinary support (1 vet + 2 techs), incremental security posts (4 guards) and included site staff.
Research And Monitoring $174K/yr
[#6, #7, #15, #21, #26] Ongoing sequencing/imaging outsourcing, sensor data storage & maintenance, field monitoring team ops, countermeasure recalibration and communications/remote interaction maintenance.
Facilities Maintenance $108K/yr
[#2, #3, #4, #13] Annual maintenance, electricity and consumables for life‑support systems, HVAC/dehumidifiers, generator fuel & maintenance, and wastewater/effluent treatment contracts.
Cover Story And Legal $105K/yr
[#16, #17, #18, #27] Annual costs for site monitoring/maintenance of closures, compensation to locals, legal retainer and outreach/cover maintenance (signage, landscape stabilization).
Insurance And Liability $100K/yr
[#23] Annual insurance, liability reserves and incident response funds held for property damage, crop/livestock claims and legal exposure.
Contingency Fund Annual $100K/yr
[#22] Recommended annual contingency allocation for population management and emergency response.
Supplies And Consumables $84K/yr
[#5, #11, #12, #25, #29] PPE consumables, sedatives/medical supplies, food procurement and storage, archive/sample storage fees, and miscellaneous office/operational consumables.
Logistics And Transport $75K/yr
[#14] Annual operations for field retrieval: vehicle maintenance, fuel, helicopter hours, night ops and transport container upkeep.
Data Security Operations $15K/yr
[#19] Ongoing secure server operation, audits, vetting and information‑containment processes.
Personnel Health $15K/yr
[#20] Ongoing medical surveillance and psychological monitoring for exposed staff.
Training Annual $10K/yr
[#24] Annual refresher training and certification costs.
Imperator Activation Staffing $0/yr
[#28] Recurring specialist staffing costs if IMPERATOR contingency is activated; set to 0 in baseline (not activated).
Cost Scenarios
📊 Baseline (baseline) $1.7M/yr
94.0% probability / year
Normal operational year with no major incidents; routine research, monitoring, field ops and contingency funding in place.
routine monitoring scheduled maintenance normal feeding and research cadence
🚨 Minor Incident $1.8M/yr
5.0% probability / year +$150K vs baseline
Limited containment incident or field retrieval-related cost spike (escaped specimen retrieval, local exposure, small repairs and legal/compensation payouts).
single specimen escape local livestock/crop damage requiring compensation minor containment repairs and overtime
🚨 Imperator Activation $3.4M/yr
1.0% probability / year +$1.8M vs baseline
Discovery/activation of SCP‑7088‑IMPERATOR necessitating rapid scale‑up of containment (major construction, specialized teams) and emergency population management.
IMPERATOR subspecies detected major escalation in threat level emergency scale‑up of containment
👥 Personnel 11 total
Role Count Notes
Research Scientist 2 [#8] Lead and supporting cryptozoology/biological research staff to design experiments, oversee welfare and interpret behaviour.
Veterinarian 1 [#9] On‑site or full‑time veterinarian for husbandry, medical procedures and supervision of animal health.
Animal Technician 2 [#9] Husbandry and day‑to‑day care technicians responsible for feeding, cleaning and sample collection.
Security Officer / MTF Agent 4 [#10] Incremental posted guards and rapid response personnel for site perimeter and cave entrance monitoring.
Engineer / Maintenance 1 [#2, #3, #4] Facilities/engineer for life‑support, HVAC, power resiliency maintenance and repairs.
Administrative Staff 1 [#29] Administrative and procurement support handling contracts, logistics and cover documentation.
📋 Confidence Notes
Containment and operational details are well described (cavernous habitat, feeding cadence, monitoring needs) allowing reasonable cost mapping, but large uncertainties remain around site geology, scope of retrofit vs new construction, and the low‑probability/high‑cost IMPERATOR contingency.
← SCP-7087 ↑ All SCPs SCP-7089 →