SCP-7088
Unknown
~
medium confidence
SCP-7088
Expected annual
$1.7M
One-time setup
$4.4M
Annual recurring
$1.7M
Personnel
11
Initial capital to build an artificial cavern, life‑support, monitoring and specialist lab setup is the primary one‑time cost (~$4.4M). Annual staffing (scientists, vets, techs, security), research/monitoring, field operations and contingency reserves drive recurring costs (~$1.67M/yr).
One-Time Capital Costs
Total: $4.4M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal operational year with no major incidents; routine research, monitoring, field ops and contingency funding in place.
routine monitoring
scheduled maintenance
normal feeding and research cadence
🚨
Minor Incident
$1.8M/yr
Limited containment incident or field retrieval-related cost spike (escaped specimen retrieval, local exposure, small repairs and legal/compensation payouts).
single specimen escape
local livestock/crop damage requiring compensation
minor containment repairs and overtime
🚨
Imperator Activation
$3.4M/yr
Discovery/activation of SCP‑7088‑IMPERATOR necessitating rapid scale‑up of containment (major construction, specialized teams) and emergency population management.
IMPERATOR subspecies detected
major escalation in threat level
emergency scale‑up of containment
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 2 | [#8] Lead and supporting cryptozoology/biological research staff to design experiments, oversee welfare and interpret behaviour. |
| Veterinarian | 1 | [#9] On‑site or full‑time veterinarian for husbandry, medical procedures and supervision of animal health. |
| Animal Technician | 2 | [#9] Husbandry and day‑to‑day care technicians responsible for feeding, cleaning and sample collection. |
| Security Officer / MTF Agent | 4 | [#10] Incremental posted guards and rapid response personnel for site perimeter and cave entrance monitoring. |
| Engineer / Maintenance | 1 | [#2, #3, #4] Facilities/engineer for life‑support, HVAC, power resiliency maintenance and repairs. |
| Administrative Staff | 1 | [#29] Administrative and procurement support handling contracts, logistics and cover documentation. |
Confidence Notes
Containment and operational details are well described (cavernous habitat, feeding cadence, monitoring needs) allowing reasonable cost mapping, but large uncertainties remain around site geology, scope of retrofit vs new construction, and the low‑probability/high‑cost IMPERATOR contingency.