SCP-7220 Unknown ? low confidence
SCP-7220
Expected annual
$16.3M
One-time setup
$1.1B
Annual recurring
$12.1M
Personnel
24
One-time capital requirements (dominated by an optional capitol reconstruction) are on the order of ~$1.12B; baseline recurring operations including security, medical, research, memetic/IT defenses and contingency reserve run ~ $12.1M/yr. The reconstruction project (if pursued) is the dominant uncertain cost driver.
🏗️ One-Time Capital Costs Total: $1.1B
Capitol Reconstruction $1.0B
[#19] Capitol-city reconstruction: project-level capital for rebuilding a capital district / city core (very large, scope-dependent).
Construction Security Overhead $52.5M
[#20] Added overhead for secure supply chains, vetted contractors and on-site security during reconstruction.
Reserve Fund $52.5M
[#24] Recommended insurance / risk reserve fund (one-time capital reserve recommendation).
Environmental Remediation $10.2M
[#22] Soil remediation, drainage, utilities tie-in and removal of hazardous infrastructure for reconstruction.
Heavy Equipment $2.6M
[#21] Heavy equipment, vehicles, armored carriers and UAV procurement (one-time acquisition).
Long Term Preservation Setup $2.6M
[#18] One-time setup for archives, cultural artifact preservation and knowledge endowment.
Equipment $1.4M
[#7] Secure research lab & equipment (one-time equipment purchases such as benching, sequencer or imaging hardware).
Decommission Event Planning $1.0M
[#25] Contingent decommission / end-of-life disposition planning and event handling costs.
Infohazard And Memetic Systems $325K
[#9] One-time memetic-proofing systems, secure offline handling systems and initial custom software/hardware for infohazard defense.
Secure It One Time $325K
[#10] Hardened air-gapped servers, guarded media storage and initial secure IT installation costs.
Initial Research And Lab Setup $300K
[#7, #8] Laboratory buildout and initial biobank/genomic setup (benching, basic sample processing and initial sample bank setup).
Facilities $162K
[#1] Secure containment-cell retrofit: upgrade to redundant physical security, observation, medical passthrough, glazing, locksets, surveillance and medical hookups.
Power Backup Upgrade $125K
[#11] One-time backup generator/UPS upgrades and power redundancy hardware.
Contingency Medical Stock $62K
[#14] Initial contingency medical supplies and pharmaceuticals stocking.
Environmental Remediation Site Specific $0
[]
🔄 Annual Recurring Costs Total: $12.1M/yr
Reserve Replenishment $2.5M/yr
[#24] Annual replenishment to insurance/risk funds and contingency reserves.
Staff Wages $2.2M/yr
[#2, #3, #4, #6] Site security guards (12 FTE), internal rapid-response team, medical staff and dedicated research salaries including benefits and clearances.
Program Contingency $2.0M/yr
[#27] Program contingency (applied as ~20% of operational recurring budgets to cover scope uncertainty and infohazard risk).
Logistics And Transport $1.8M/yr
[#17] Field operations, satellite/UAV analytics, field teams and long-range transport budgets for detection and verification programs.
Cover Story And Legal $1.7M/yr
[#15, #16] Legal, cover-story budgets and ongoing media suppression / disinformation operations (payoffs, counsel, takedowns, press buys).
Heavy Equipment Upkeep $550K/yr
[#21] Fuel, maintenance and support contracts for vehicles, APCs and UAV fleets.
Long Term Preservation Maintenance $275K/yr
[#18] Archive maintenance, digital preservation, cultural corpus upkeep and endowment draw.
Supplies And Consumables $271K/yr
[#7, #8, #12, #13, #14] Research consumables (reagents, sequencer runs), biobank storage costs / retests, food/clothing allowances, PPE and recurring medical resupply.
Infohazard And Memetic Staffing $250K/yr
[#9] Ongoing memeticist oversight, redaction personnel, audits and training for handling infohazards.
Misc Overhead $175K/yr
[#26] Administrative overhead, clandestine procurement, credentialing and day-to-day covered operations.
Training Programs $150K/yr
[#23] Staff re-training, memetic hazard drills, rotation travel and resilience programs.
Facilities Maintenance $125K/yr
[#11] Utilities, HVAC, power operations and routine facilities maintenance, fuel contracts and generator operations.
Secure It Maintenance $100K/yr
[#10] Ongoing secure IT maintenance, forensic audits and backups.
Research And Monitoring $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $12.1M/yr
88.0% probability / year
Normal year with no major incidents or capital build; steady operations supporting containment, research and cover-ops.
no_incident no_reconstruction standard_operations
🚨 Minor Incident $12.4M/yr
8.0% probability / year +$300K vs baseline
Small containment incident requiring additional medical treatment, overtime, temporary repairs and augmented memetic/IT audits.
medical_event localized containment breach increased overtime
🚨 Major Breach $32.1M/yr
1.0% probability / year +$20.0M vs baseline
Significant security breach requiring large-scale response, relocation, legal defense and public mitigation.
security_breach public_exposure facility_damage
🚨 Capitol Reconstruction $212.1M/yr
2.0% probability / year +$200.0M vs baseline
Commencement / major spending year for the capitol reconstruction project ordered by Site Director Grey.
reconstruction_start large_capital_outlay extended_construction
🚨 Decommission Event $13.1M/yr
1.0% probability / year +$1.0M vs baseline
Event in which SCP-7220 dies or requires end-of-life disposition with significant mitigation and potential public closure operations.
SCP_death public_release final_mitigation
👥 Personnel 24 total
Role Count Notes
Security Officer / MTF Agent 12 [#2] 24/7 guard coverage assumed as 12 full-time guards (3x8h shifts, vacations/backups).
Rapid Response / Internal Team 5 [#3] Internal response team: medic, sedator, non-lethal weapons tech, and 2 operators on-call 24/7.
Medical Officer 3 [#4] Physician, nurse and lab technician for recurring medical care and emergencies.
Research Scientist 4 [#6] Dedicated research staff (midpoint of 2–6 personnel) for behavioral/genetic/cognitive study.
📋 Confidence Notes
Large ranges in analyst estimates (especially for capitol reconstruction and legal/media suppression), infohazard uncertainties, and conditional multi-year capital projects produce low confidence in point estimates.
← SCP-7219 ↑ All SCPs SCP-7221 →