SCP-724
Safe
✓
high confidence
SCP-724
Expected annual
$3.3M
One-time setup
$4.8M
Annual recurring
$3.3M
Personnel
26
Estimated one-time setup costs are approximately $4.78M, driven by site acquisition, vault construction, shielding and instrumentation; recurring annual costs are approximately $3.25M/year, driven primarily by staff wages, legal/cover maintenance, and ongoing research/monitoring.
One-Time Capital Costs
Total: $4.8M
Annual Recurring Costs
Total: $3.3M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.3M/yr
Normal operation year with routine research, animal care, and maintenance; no major incidents or public exposure.
no_incident
scheduled_operations
🚨
Minor Incident
$3.6M/yr
Localized containment failure, minor breach of a kennel or actuator failure requiring repairs, limited public exposure, and legal/PR response.
actuator_failure
localized_breach
small_public_incident
🚨
Major Breach
$4.8M/yr
Significant breach or public exposure requiring major repairs, replacements, significant legal settlements, extended PR campaign, and possible relocation.
vault_or_plate_failure
wide_public_exposure
major_legal_action
🚨
International Investigation
$3.8M/yr
Discovery of remote transmitters or foreign sites tied to SCP-724-1 receiver locations, requiring overseas investigation/covert operations.
remote_receiver_discovery
foreign_site_investigation
Personnel
26 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 3 | Lead researchers and principal investigators for SCP-724 studies; maps to research salary pool [#11]. |
| RF Engineer | 2 | RF monitoring, spectrum analysis and instrumentation operation; maps to research salary pool [#11, #9]. |
| Bioacoustics Analyst | 1 | Audio analysis, transcription and correlation with RF logs; maps to research and data curation [#23]. |
| Lab Technician / Animal Care Technician | 4 | Daily animal care, feeding and enclosure maintenance; primary component of animal care salaries [#12]. |
| Veterinary Officer / Consultant | 1 | Routine and emergency veterinary services (contracted/onsite); maps to veterinary_services [#12]. |
| Security Officer / MTF Agent | 10 | Site security, reception staff posing as front-company personnel and supervisors; maps to security salary pool [#16]. |
| Site Director / Administrative Staff | 2 | Site leadership, front-company administrative roles and HR/payroll; maps to admin/cover overhead [#32]. |
| Engineer / Maintenance | 1 | Facilities, actuators, generator maintenance and contractor coordination; maps to facilities maintenance [#7, #27]. |
| IT / Digital Security | 2 | Secure document handling, air-gapped backups, and IT security operations; maps to IT security and secure IT costs [#22]. |
Confidence Notes
Analyst notes provide detailed line-item ranges for capital and operating expenses across containment, research, and cover operations; estimates are mid-range aggregations and thus have high confidence for order-of-magnitude planning.