SCP-7264
Unknown
~
medium confidence
SCP-7264
Expected annual
$1.8M
One-time setup
$15.3M
Annual recurring
$1.7M
Personnel
8
Estimated up-front capital is approximately $15.3M driven primarily by the Cross-Pollination emergency vault and contingency reserves; recurring annual costs are roughly $1.73M/yr dominated by designated-reader wages, medical readiness and ongoing monitoring/lab operations.
One-Time Capital Costs
Total: $15.3M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal year with weekly readings, routine maintenance, training and no major incidents.
standard weekly reads
no breaches
routine maintenance
🚨
Minor Incident
$2.0M/yr
Localized contamination or medical incident during a reading requiring extra medical care, targeted cleanup and short-term operational disruption.
single-reader exposure requiring extended medical care
local contamination needing decon and sample analysis
🚨
Major Breach
$4.2M/yr
Containment breach or significant reality drift requiring deployment of hardened vault measures, mobile response, expanded medical operations and temporary relocation of staff.
localized reality-linearization
failure of locker/room containment
significant personnel casualties
🚨
Political Exposure
$6.7M/yr
Civilian discovery or legal/political fallout requiring major legal/PR operations, settlements, accelerated procurement and possible relocation or longer-term facility hardening.
public leak
civilian casualties
hostile media/legal action
🚨
Catastrophic Cross Pollination
$51.7M/yr
Tashkent-Class cross-pollination or similar catastrophic interaction requiring full K‑class mitigation, mass-evacuation, multi-site coordination and maximum contingency expenditure.
cross-anomaly interaction
rapid reality linearization
large-scale biospatial release
Personnel
8 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / Designated Reader | 6 | [#5] Six qualified readers required by the weekly-reading protocol; total salary budget accounted in staff_wages. |
| Security Officer / MTF Agent | 2 | [#8] Dedicated on-duty security detail for readings and roster coverage; cost included in staff_wages. |
Confidence Notes
Line-item estimates are based on analyst guidance but are order-of-magnitude; major uncertainties stem from the low-probability/high-impact contingency decisions (vault sizing, whether weekly readings continue) and accelerated procurement multipliers.