SCP-7284
Unknown
~
medium confidence
SCP-7284
Expected annual
$2.8M
One-time setup
$6.0M
Annual recurring
$2.7M
Personnel
12
Estimated upfront construction and outfitting costs are about $5.95M, dominated by a custom reinforced semi‑aquatic containment structure and associated life‑support/backup systems; recurring annual operating costs are roughly $2.71M/yr driven by staff wages, research, utilities, and maintenance.
One-Time Capital Costs
Total: $6.0M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Normal operating year with no major incidents; routine maintenance, staffing, research and reporting continue as planned.
routine_operations
scheduled_research
no_breach_events
🚨
Minor Incident
$2.9M/yr
Localized incident (injury, small escape within facility bounds, equipment damage) requiring overtime, repairs and temporary increased veterinary care.
collision_damage
localized_escape
minor_equipment_failure
🚨
Major Breach
$3.7M/yr
Significant escape or containment breach requiring full recapture operation, major infrastructure repairs, legal/PR response and temporary relocation/augmentation of staff.
full_escape_to_local_area
major_infrastructure_failure
extended_recapture_operation
🚨
Political Exposure
$5.2M/yr
Discovery by public or local authorities leading to investigations, heavy legal/cover costs, potential relocation or euthanasia, and significant hush/public affairs expenses.
public_incident
media_leak
government_investigation
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Animal Caretaker / Keeper | 6 | [#10] Full-time keepers (6) to provide round-the-clock care as per analyst note (used the mid-range staffing estimate). |
| Security Officer / MTF Agent | 5 | [#11] In-facility and perimeter security staff to meet staffing/operations estimates for guards and access control. |
| Veterinary Officer / Consultant | 1 | [#9, #13] Specialized veterinary support (marine reptile/exotics/gerontology) represented as one dedicated FTE or equivalent contracted role. |
Confidence Notes
Numerical ranges and many line items are provided in analyst notes allowing midpoint estimates, but local construction costs, GOI contract structures and contingency choices create material uncertainty.