SCP-7317
Unknown
?
low confidence
SCP-7317
Expected annual
$2.7M
One-time setup
$1.6M
Annual recurring
$2.7M
Personnel
10
Estimated one-time capital outlays are approximately $1.59M driven by lab buildout, containment-research projects and vehicles/equipment; recurring annual costs are roughly $2.55M driven primarily by staff wages, legal/cover operations, ongoing research and high consumable/test tempo.
One-Time Capital Costs
Total: $1.6M
Annual Recurring Costs
Total: $2.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.7M/yr
Normal year with routine testing tempo, ongoing research, and no major public incidents or containment failures.
routine_testing
ongoing_research
regular_community_engagement
🚨
Minor Incident
$2.7M/yr
Localized incident causing medical response, equipment replacement, small legal payouts and increased community payments.
onsite_injury
equipment_loss
small_public_exposure
🚨
Major Breach
$3.5M/yr
Significant public exposure or containment failure in Frémont requiring large-scale legal settlements, heavy PR campaign, major replacements and possible temporary research suspension.
public_incident
legal_action
major_equipment_and_infrastructure_repair
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#4] Four dedicated guards (two shifts) trained in non-lethal control and historical/behavioral protocols; wage costs included in staff_wages. |
| Research Scientist | 3 | [#9, #10, #11, #21] Paranormal/archaeological/thaumaturgical specialists (2–4 FTEs budgeted; model uses 3 FTEs) responsible for ongoing experiments, artifact study and containment-limitation research. |
| Rapid Response Team | 2 | [#5] Small RRT for on-site incidents including sedation equipment and transport; staffing costs included in staff_wages. |
| Medical Officer / Contractor | 1 | [#6] Contracted medical support familiar with anomalous healing for trauma care and monitoring; recurring costs captured in medical_support and staff_wages. |
Confidence Notes
Estimates are low-confidence due to wide ranges provided in analyst notes, conditional project-level costs (large containment research projects), the unusual legal/diplomatic constraints (1958 Accords), and uncertain incident rates for region-bound immortal D-Class.