SCP-7341
N/A
~
medium confidence
SCP-7341
Expected annual
$1.6M
One-time setup
$1.7M
Annual recurring
$1.5M
Personnel
10
Estimated one-time setup costs are approximately $1,705,000, with ongoing annual operating costs of about $1,491,000. Main drivers are continuous staffing (security and site leadership), remote-site equipment and comms, facilities buildout/maintenance, OPSEC/community liaison, and an on-site contingency fund.
One-Time Capital Costs
Total: $1.7M
Annual Recurring Costs
Total: $1.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.5M/yr
Normal operational year with steady staffing, routine maintenance, and no major incidents.
steady operations
no intrusions
routine maintenance only
🚨
Minor Incident
$1.6M/yr
Localized equipment failure, small perimeter breach, or media exposure requiring repairs, short-term PR/legal response, and limited medical/evacuation support.
perimeter intrusion
equipment failure (generator/camera)
small public exposure
🚨
Major Breach
$7.5M/yr
Significant containment/terminality bleedthrough escalation or large-scale structural failure requiring major remediation, extended emergency response, and possible high-level containment intervention.
MYRKURHUGI logic fault
power allocation failure
large terminality expansion
Personnel
10 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#8] 24/7 perimeter and site security coverage; two-per-shift model with rotation and leave coverage. |
| Site Director / Commander | 1 | [#9] On-site command and liaison with higher command and local authorities. |
| Technician / Maintenance | 1 | [#9] Facilities, generator, vehicle, and sensor maintenance; on-call repairs. |
| Medical Officer | 1 | [#9] On-call medic / first responder shared regionally for emergencies. |
| Research/Monitoring Analyst | 1 | [#12] Sensor/video telemetry monitoring, data storage management, and analyst oversight. |
Confidence Notes
Estimates are built from analyst-provided ranges and typical remote-site costs; however, the SCP's metaphysical containment context and variable decisions (purchase vs lease, secrecy level, contingency use) create moderate uncertainty.