SCP-7371
Unknown
~
medium confidence
SCP-7371
Expected annual
$20.8M
One-time setup
$5.6M
Annual recurring
$20.5M
Personnel
39
Estimated one-time capital costs are roughly $5.64M for specialized construction, vaulting and equipment; annual recurring costs are about $20.5M driven primarily by gold procurement, contingency fund contributions, and personnel costs.
One-Time Capital Costs
Total: $5.6M
Annual Recurring Costs
Total: $20.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$20.5M/yr
Normal year with scheduled gold deliveries and routine operations, no major incidents.
scheduled_gold_deliveries
routine_maintenance
🚨
Minor Taak Incident
$21.0M/yr
Localized Taak-event or minor containment incident that requires emergency response, additional medical care, shelter activation and per-incident PR/legal actions.
failed_delivery
localized Taak spread
emergency_shelter_activation
🚨
Major Breach
$30.5M/yr
Major containment failure or widespread Taak-event causing extensive site damage, MTF casualties, large-scale evacuation and high-cost remediation/insurance payouts.
containment_breach
widespread Taak propagation
site_infrastructure_damage
Personnel
39 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 24 | [#9] 24 guards (covering shifts, rapid-response), salaries and benefits included in staff_wages; count based on analyst range 12–36, midpoint staffing chosen. |
| Research Scientist | 6 | [#16] Research staff (behavioral, anomalous, linguistic/temporal specialists), salaries included in staff_wages; chosen within analyst range 4–10. |
| Medical Officer | 3 | [#13] On-site medical and psychiatric staff (2–4 recommended); salaries and emergency care costs included in staff_wages and recurring medical estimates. |
| Engineer / Maintenance | 3 | [#5, #6, #28] Maintenance staff for HVAC, backup power and perimeter systems; salaries included in staff_wages. |
| Administrative Staff | 3 | [#27] Operations/compliance personnel to manage deliveries, timing coordination and chain-of-custody; salaries included in staff_wages. |
Confidence Notes
Analyst notes provide detailed line items and ranges; midpoints used for estimates. Uncertainty remains due to volatile gold prices, infrequent high-impact Taak events and site-specific construction variability.