SCP-7382
Keter
~
medium confidence
SCP-7382
Expected annual
$1.7M
One-time setup
$3.2M
Annual recurring
$1.6M
Personnel
9
First-year capital expenditures are approximately $3,180,000 driven by hardened containment construction, redundant cooling/power/suppression systems, specialized equipment, and a $1,000,000 contingency reserve; recurring annual costs are approximately $1,585,000 driven by security wages, specialized research/memetic support, energy, and maintenance.
One-Time Capital Costs
Total: $3.2M
Annual Recurring Costs
Total: $1.6M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.6M/yr
Normal operational year with no major incidents; routine containment and research activities.
no breach
regular maintenance and research
normal personnel turnover
🚨
Minor Incident
$1.8M/yr
Localized containment event that is rapidly controlled (small breach, temporary equipment damage, medical treatment for staff).
small containment breach
temporary cooling/suppression failure
limited equipment replacement and overtime
🚨
Major Breach
$4.1M/yr
Significant containment failure requiring major repairs/rebuild, asset replacement, extended emergency response, and potential civilian reparations.
full containment breach
destruction of containment chamber or primary cooling systems
large-scale emergency contracting and replacement
Personnel
9 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 8 | [#10] Two-person 24/7 coverage requiring ~6–8 full-time guards to cover shifts; estimate uses 8 FTE. |
| Tactical Theology Specialist / Level-3+ Theologian | 1 | [#11] On-site senior theologian / specialist oversight (Level-3+), full-time or on-call equivalent. |
Confidence Notes
Analyst notes provide detailed line-item estimates for most costs, producing a well-scoped budget; uncertainty remains due to Keter-class anomalous behavior (potential for orders-of-magnitude scaling if energy/memetic activity increases) and assumptions about transport frequency and incident probabilities.