SCP-7432 Unknown ? low confidence
SCP-7432
Expected annual
$3.4M
One-time setup
$146.8M
Annual recurring
$3.3M
Personnel
16
One-time capital requirements are large (~$147M) driven primarily by a deep-time endowment and long-tail continuity guarantees (manufacture/storage of specific tracker models, contingency reserves, vaulting). Annual operating costs are moderate (~$3.33M/yr), driven by security and Chronology personnel, ongoing monitoring/maintenance, and legal/cover operations.
🏗️ One-Time Capital Costs Total: $146.8M
Endowment Capital $100.0M
[#8] Deep-time endowment/trust to guarantee continuity to 2188 (chosen conservative capital to support multi-century operations).
Contingency Disaster Response Reserve $20.0M
[#19] Seed reserve for large-scale recovery from accidental portal events or containment disasters (conservative mid-high reserve).
Equipment $7.7M
[#4, #12, #23, #7] CCTV/sensor install, armored transport capsule/remote-manipulator vehicles, replica keystone manufacture, manufacture/deep-storage of Model XRTD-MCD/IV units (midpoint estimates).
Initial Research And Lab Setup $7.1M
[#6, #10, #11] Temporal/spatial R&D and sensor deployment, non-invasive imaging instruments, and controlled-access test-rig construction (midpoint estimates).
Decommissioning Reserve $5.5M
[#25] Planning reserve for eventual decommissioning/transfer (midpoint estimate).
Insurance Reserve $2.0M
[#20] One-time litigation/indemnity reserve to cover large legal actions or seizures.
Property Purchase $1.8M
[#1] Purchase of 17 Cromwell Street and immediate parcel (mid-range purchase estimate chosen rather than lease).
Facilities $1.6M
[#2, #9, #13] Structural fortification, vault/hardening setup and backup-power/environmental control installations (midpoint estimates).
Amnestic Large Incident Reserve $1.0M
[#15] Reserve for a single large amnestic operation (100s of persons) as contingency.
Initial Legal Pr Setup $125K
[#14] Initial legal/PR/cover-story setup costs (registration, covert payments, initial retainers).
Purchase Legal Clearance $100K
[#1] Initial title/legal/eviction/clearance costs associated with purchase.
🔄 Annual Recurring Costs Total: $3.3M/yr
Staff Wages $1.4M/yr
[#3, #5, #17, #18] On-site 24/7 security staffing (~8 guards), Chronology Dept personnel (2 chronologists + 1 archivist), specialist research team (3 FTEs), and mental-health team (2 FTEs); salaries + benefits/overhead (mid-range).
Research And Monitoring $1.0M/yr
[#6, #4, #10, #11, #22, #24, #21] Ongoing temporal/spatial monitoring & device maintenance, remote monitoring connectivity/cloud storage, imaging staff time, test-rig operations, averaged hardware refresh, routine training/exercises, and inter-branch coordination/travel budgets (mid-range averages).
Cover Story And Legal $530K/yr
[#14, #16, #20] Annual legal retainers, local-government relations, cover-story/community payments, PR diversion and related recurring legal/relations spending.
Supplies And Consumables $150K/yr
[#15, #18] Annual budget for amnestic agents, medical consumables and consumable materials for cognitive-hazard response.
Facilities Maintenance $100K/yr
[#13, #9] Routine maintenance of backup power systems, environmental controls, and off-site archive vault rotation/maintenance.
Logistics And Transport $60K/yr
[#12] Readiness training/drills and maintenance for armored transport/extraction equipment (annualized).
Xrt Model Storage Maintenance $60K/yr
[#7] Annual maintenance, environmental control and checks for stored XRTD-MCD/IV units (mid-range).
Property Lease $0/yr
[#1] Lease option for property listed in original notes; purchase option chosen in baseline, so lease set to 0 in this estimate.
Cost Scenarios
📊 Baseline (baseline) $3.3M/yr
97.9% probability / year
Routine year with purchase of property and no major incidents; regular monitoring, staffing, and maintenance only.
no_incident steady_operations
🚨 Minor Incident $3.8M/yr
2.0% probability / year +$500K vs baseline
Small unauthorized contact or localized incident requiring amnestic deployment, legal response, and short-term surge in staffing/monitoring.
unauthorized_touch local_media_exposure small-scale temporal anomaly
🚨 Major Breach $13.3M/yr
0.1% probability / year +$10.0M vs baseline
Significant containment failure or cross-temporal incursion requiring deployment of contingency fund, emergency extraction/transport, large-scale amnestics, legal defense and possible repairs.
containment_breach mass_cross-temporal_incursion major_public_exposure
👥 Personnel 16 total
Role Count Notes
Security Officer / MTF Agent 8 [#3] 24/7 on-site security coverage (three shifts, includes overtime/hazard pay).
Chronologist 2 [#5] Chronology Department temporal specialists performing yearly documentation audit and monitoring.
Archivist 1 [#5] Dedicated archivist for documentation preservation and redundancy.
Research Scientist 3 [#17] Specialist research team (linguistics, archaeology, anomalous physics) supporting analysis and R&D.
Medical Officer 2 [#18] Mental-health / cognitive-hazard response clinicians and support staff.
📋 Confidence Notes
Estimates are low-confidence due to wide ranges in century-scale obligations, multiple viable operational strategies (purchase vs lease, manufacture vs legal trust), and highly uncertain probabilities for temporal incidents; many assumptions use mid-range values.
← SCP-7431 ↑ All SCPs SCP-7433 →