SCP-7457
Unknown
~
medium confidence
SCP-7457
Expected annual
$7.3M
One-time setup
$37.8M
Annual recurring
$6.9M
Personnel
36
One-time capital costs are dominated by contingency reserves, site conversion, R&D for memetic filters and lab/equipment build-out (~$37.8M one-time). Recurring annual operations are staff-driven plus research and maintenance (~$6.89M/yr), with scenario-based breach costs that can spike into the millions.
One-Time Capital Costs
Total: $37.8M
Annual Recurring Costs
Total: $6.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$6.9M/yr
Normal operational year with no major containment incidents; routine research and maintenance only.
no breach
routine research
scheduled maintenance
🚨
Minor Incident
$7.9M/yr
Localized personnel exposures or small breach requiring medevac, repairs, and targeted amnestic/legal response.
single-person severe exposure
localized memetic leakage
small structural/technical failure
🚨
Major Breach
$21.9M/yr
Significant memetic leakage or public exposure requiring region-wide amnestic deployment, large-scale medical care, major reconstruction and heavy PR/legal operations.
multiple-person simultaneous exposure
civilian casualties or media exposure
failure of memetic filters or mass dissemination
Personnel
36 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist (senior memetic researcher) | 4 | Senior specialists with memetics clearance; high salary and risk premium reflected in staff_wages. |
| Research Technician / Junior Researcher | 8 | Lab techs and junior researchers supporting cataloguing, imaging and safe-handling protocols. |
| Conservator / Lab Specialist | 3 | Specialist conservators for restoration and preservation; salaries included in staff_wages and recurring conservator budget. |
| Security Officer / MTF Agent | 12 | 24/7 on-site security force across shifts; includes training and equipment costs noted in one-time and recurring budgets. |
| Medical Officer | 3 | On-site medic(s) and access to surgical support; medevac contract and trauma care costs covered in recurring budget. |
| Engineer / Maintenance | 4 | Responsible for power, HVAC, dehumidification, structural inspections and equipment maintenance. |
| Administrative Staff | 2 | Project administration, local liaison coordination, and cover-story management; overhead in recurring budgets. |
Confidence Notes
Analyst notes provide detailed line-items and ranges, enabling reasonable mid-point estimates, but memetic risks, contingency sizing for widespread exposure, and site-specific geotechnical variability introduce significant uncertainty.