SCP-7458
Euclid
~
medium confidence
SCP-7458
Expected annual
$1.8M
One-time setup
$2.1M
Annual recurring
$1.7M
Personnel
15
One-time capital/setup is approximately $2,085,000 driven primarily by cell construction, HVAC/suppression installations, equipment and regulatory/liability reserves; recurring annual costs are approximately $1,737,000 driven by staff wages, medical monitoring, HVAC/energy and maintenance.
One-Time Capital Costs
Total: $2.1M
Annual Recurring Costs
Total: $1.7M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.7M/yr
Normal uneventful year with planned maintenance, staffing, monitoring and small consumables usage; no significant combustion incident.
no combustion beyond minor sensor events
regular maintenance and training only
🚨
Minor Incident
$1.8M/yr
One minor combustion event or several small endothermic spikes requiring cleanup, investigation and minor repairs.
small spontaneous combustion event
limited structural/asset damage
hazardous-waste disposal and forensic analysis required
🚨
Major Incident
$2.5M/yr
A serious spontaneous-combustion event causing significant structural damage, extended medical/claims costs, large-scale cleanup and PR/legal response.
extreme endothermic event / spontaneous combustion
significant facility damage and public exposure
major medical claims and legal/PR costs
Personnel
15 total
| Role | Count | Notes |
|---|---|---|
| Containment Technician | 4 | [#11] 24/7 containment coverage (4 full-time rotating techs included in wages). |
| Security Officer / MTF Agent | 6 | [#12] 24/7 guard coverage (6 personnel to staff shifts; wages included). |
| Research Scientist | 3 | [#13] Two mid/high-level researchers and one data-engineering/support role (3 total; wages included). |
| Medical Officer | 1 | [#10] On-call medical nurse/EMT retainer and transfer arrangements (budgeted as staffing). |
| Administrative Staff | 1 | [#30] Administrative/site management and clearance/recordkeeping support (budgeted in wages/overhead). |
Confidence Notes
Analyst notes provide detailed line-item estimates for capital and recurring items, increasing confidence; uncertainty remains around frequency/severity of combustion incidents, asbestos regulatory outcomes and large claims, so overall confidence is medium.