SCP-7458 Euclid ~ medium confidence
SCP-7458
Expected annual
$1.8M
One-time setup
$2.1M
Annual recurring
$1.7M
Personnel
15
One-time capital/setup is approximately $2,085,000 driven primarily by cell construction, HVAC/suppression installations, equipment and regulatory/liability reserves; recurring annual costs are approximately $1,737,000 driven by staff wages, medical monitoring, HVAC/energy and maintenance.
🏗️ One-Time Capital Costs Total: $2.1M
Facilities $900K
[#1, #4] Reinforced containment cell construction and localized HVAC/heat-extraction installation (reinforced concrete, refractory coatings, ducting/isolation and chillers/air-handling units).
Equipment $570K
[#2, #3, #5, #6, #8, #17, #20, #24, #32] Triple-mode fire-suppression installation (hardware), redundant detectors/telemetry, backup generator/UPS, heat/flame-resistant furnishings, initial PPE sets, monitoring software/hardware deployment, HEPA/air-filtration equipment, initial data servers/storage, and security hardware.
Health Liability Reserve $250K
[#27] One-time long-term health liability reserve for asbestos and burn claims.
Asbestos Compliance Setup $150K
[#7] One-time permits, licensed procurement setup, abatement plan development and legal counsel costs to allow asbestos-cotton furnishings and compliance program initiation.
Initial Research And Lab Setup $75K
[#14] Testing equipment and scientific instruments (high-speed cameras, calorimeters, thermocouples, gas analyzers) and initial calibration/setup for research.
Occupational Health Setup $50K
[#9] Initial occupational health surveillance program setup (baseline screening protocols, records, contracting occupational-medicine provider).
Insurance Pr Setup $50K
[#23] Initial PR/cover-story planning and setup cost (one-time portion of cover-story/legal readiness).
Transport Relocation Fund $50K
[#28] One-time fund for specialized heat-resistant crates, rigging and transport contingency.
Fire Brigade Training Initial $15K
[#18] Initial joint-training and coordination exercise with local/contracted firefighting liaison.
Medical Supplies Initial $10K
[#10] Initial on-site medical / burn-dressing / triage supplies stock.
Training Program Setup $10K
[#16] Initial development and rollout of communication-restrictions & no‑praise training, signage and scripts.
Psych Screening Setup $5K
[#26] Initial psychological screening and HR processing setup for staff.
🔄 Annual Recurring Costs Total: $1.7M/yr
Staff Wages $1.0M/yr
[#11, #12, #13, #10, #30] Annual salaries + benefits for containment technicians (4 × $70k), security guards (6 × $50k), research/analytics personnel (2 × $120k + 1 × $90k), on-call medical/transfer retainer (budgeted as staffing $80k/yr) and administrative staff/overhead payroll (~$40k/yr).
Research And Monitoring $338K/yr
[#9, #15, #25, #29, #31, #26] Ongoing occupational health monitoring ($30k) plus follow-ups ($3k), controlled-experiment operating budget ($50k/yr), external specialist consults/fire engineers/materials scientists/toxicologists ($30k/yr), long-term mitigation R&D program ($200k/yr), and annual incident investigation & forensics retainer (~$25k/yr).
Facilities Maintenance $139K/yr
[#2, #3, #4, #5, #7, #8, #14, #17, #18, #24, #32, #20] Annual service & refill for suppression, detector calibration, HVAC energy/maintenance, generator fuel & maintenance, asbestos inspections, PPE maintenance, equipment calibration, monitoring software licensing & tuning, recurring drills coordination, data hosting/maintenance, security hardware maintenance, and HEPA filter replacements.
Cover Story And Legal $100K/yr
[#23] Annual legal retainer, liability/cover-story budget and PR retainer costs.
Structural Repair Reserve $100K/yr
[#22] Annual reserve amortized for structural repairs after medium-to-major combustion incidents.
Hazardous Waste Disposal $20K/yr
[#21] Licensed hazardous-waste disposal for asbestos textiles, combustion residue and contaminated PPE (budgeted baseline).
Supplies And Consumables $10K/yr
[#19] Regular consumables: extinguishers, agent refills, filters, bedding replacements, batteries and similar expendables.
Logistics And Transport $0/yr
[]
Cost Scenarios
📊 Baseline (baseline) $1.7M/yr
65.0% probability / year
Normal uneventful year with planned maintenance, staffing, monitoring and small consumables usage; no significant combustion incident.
no combustion beyond minor sensor events regular maintenance and training only
🚨 Minor Incident $1.8M/yr
30.0% probability / year +$50K vs baseline
One minor combustion event or several small endothermic spikes requiring cleanup, investigation and minor repairs.
small spontaneous combustion event limited structural/asset damage hazardous-waste disposal and forensic analysis required
🚨 Major Incident $2.5M/yr
5.0% probability / year +$750K vs baseline
A serious spontaneous-combustion event causing significant structural damage, extended medical/claims costs, large-scale cleanup and PR/legal response.
extreme endothermic event / spontaneous combustion significant facility damage and public exposure major medical claims and legal/PR costs
👥 Personnel 15 total
Role Count Notes
Containment Technician 4 [#11] 24/7 containment coverage (4 full-time rotating techs included in wages).
Security Officer / MTF Agent 6 [#12] 24/7 guard coverage (6 personnel to staff shifts; wages included).
Research Scientist 3 [#13] Two mid/high-level researchers and one data-engineering/support role (3 total; wages included).
Medical Officer 1 [#10] On-call medical nurse/EMT retainer and transfer arrangements (budgeted as staffing).
Administrative Staff 1 [#30] Administrative/site management and clearance/recordkeeping support (budgeted in wages/overhead).
📋 Confidence Notes
Analyst notes provide detailed line-item estimates for capital and recurring items, increasing confidence; uncertainty remains around frequency/severity of combustion incidents, asbestos regulatory outcomes and large claims, so overall confidence is medium.
← SCP-7457 ↑ All SCPs SCP-7459 →