SCP-7468
Unknown
~
medium confidence
SCP-7468
Expected annual
$9.1M
One-time setup
$24.5M
Annual recurring
$8.8M
Personnel
44
Initial capital costs are dominated by constructing two reinforced Large Containment Chambers and associated specialized equipment (~$24.5M one-time). Annual operations are driven by staffing, research, maintenance and contingency reserves (~$8.83M/yr).
One-Time Capital Costs
Total: $24.5M
Annual Recurring Costs
Total: $8.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$8.8M/yr
Normal year with scheduled maintenance, research, staffing and no major incidents.
routine_maintenance
scheduled_research
no_breach
🚨
Minor Incident
$9.0M/yr
Limited containment incident requiring extra repairs, medical treatment, and disposal operations but no structural loss.
localized_damage
extra_medical_cases
panel_replacements
🚨
Major Breach
$13.8M/yr
Significant breach or concentrated damage requiring major repairs, partial chamber refurbishment, and elevated legal/PR response.
partial_chamber_failure
large_scale_medical_response
major_disposal_operations
🚨
Catastrophic Breach
$48.8M/yr
Catastrophic containment failure requiring site evacuation/rebuild, replacement of both LCCs, major legal/PR expenditures and long-term relocation.
site_loss
public_exposure
total_chamber_replacement
Personnel
44 total
| Role | Count | Notes |
|---|---|---|
| Security Officer | 16 | [#11] Full-time guards for 24/7 site security and immediate containment response. |
| MTF Specialist | 6 | [#11] Specialized mobile task force agents / rapid response specialists for containment incidents. |
| Engineer / Maintenance | 8 | [#11] Engineers and technicians for robotics, EM systems, HVAC, power and structural maintenance. |
| Research Scientist | 4 | [#11, #7, #18] Researchers and analysts for audio/linguistics, behavioral experiments and data analysis. |
| Medical Officer | 6 | [#11, #14] On-site medical staff for trauma care, pathology and monitoring of staff/Class-D subjects. |
| Administrative Staff | 4 | [#11] Administrative, logistics and records personnel to manage Class-D program, cover logistics and procurement. |
Confidence Notes
Line-item estimates are detailed and internally consistent, but key technical unknowns (effectiveness of electromagnetic immobilization, actual damage rate caused by SCP-7468, political/legal volatility of a Class-D program) introduce notable uncertainty in recurring and contingency sizing.