SCP-7501
Pending
~
medium confidence
SCP-7501
Expected annual
$1.2M
One-time setup
$7.3M
Annual recurring
$1.1M
Personnel
7
Initial capital (BSL-3 retrofit, contingency, and specialized one-time items) dominates costs (~$7.2M), while annual operations (personnel, research, security, and overhead) run about $1.15M/year; transport/orbital recovery or major breaches can add millions in a single year.
One-Time Capital Costs
Total: $7.3M
Annual Recurring Costs
Total: $1.1M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.1M/yr
Normal year with containment and ongoing research; no major incidents or extraordinary recovery missions.
stable containment
routine research
no recovery or breach events
🚨
Minor Incident
$1.2M/yr
Isolated animal death or minor containment event requiring necropsy, decontamination turnover, and extra diagnostics.
animal death/necropsy
localized decontamination
additional targeted testing
🚨
Major Breach
$2.1M/yr
Significant containment breach or discovery of hazardous anomalous properties requiring large upgrades, extended emergency response, and PR/legal actions.
containment breach
hazardous anomalous property discovered
major decontamination and upgrades
🚨
Orbital Retrieval
$6.1M/yr
High-cost recovery operation (orbital retrieval) required to secure specimen or debris — single-year heavy capital outlay.
specimen located in orbit
decision to perform dedicated retrieval
international/contracted launch costs
Personnel
7 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist / PI | 1 | Senior researcher leading study (salary $150k/yr). |
| Research Laboratory Technician | 1 | Dedicated lab technician for assays and sample prep (salary $70k/yr). |
| Animal Technician | 1 | Daily husbandry and animal care (salary $50k/yr). |
| Veterinarian (part-time) | 1 | Onsite veterinarian at ~0.2 FTE accounted as $25k/yr. |
| Biosafety Officer (on-call) | 1 | On-call biosafety oversight (~0.1 FTE, $10k/yr). |
| Security Officer / MTF Agent | 2 | Two overnight guards (costs included under security personnel operations). |
Confidence Notes
Analyst notes provide detailed line items and ranges, enabling a moderate-confidence estimate. Uncertainty remains high around conditional events (specialized anomalies, ocean/orbital recovery or discovery of dangerous properties) which can change costs by orders of magnitude.