SCP-7502
Unknown
~
medium confidence
SCP-7502
Expected annual
$23.7M
One-time setup
$431.6M
Annual recurring
$20.2M
Personnel
53
Large upfront capital (hundreds of millions) is required, dominated by deep shaft construction and a catastrophic contingency reserve; recurring annual operations (~$20M/yr) are driven by staff wages, shaft/facility maintenance, and joint National Guard collaboration.
One-Time Capital Costs
Total: $431.6M
Annual Recurring Costs
Total: $20.2M/yr
Cost Scenarios
📊
Baseline
(baseline)
$20.2M/yr
Normal, uneventful year with routine operations, maintenance and research.
normal_operations
scheduled_maintenance
routine_research_cycles
🚨
Minor Incident
$23.2M/yr
Localized equipment failure or minor shaft incident requiring emergency response, repairs and temporary research pause.
equipment_failure
small_shaft_repair
localized_environmental_release
🚨
Major Breach
$170.2M/yr
Severe destabilization of the liquimorph or significant shaft failure causing extensive infrastructure damage and large compensation/liability exposure.
shaft_damage
liquimorph_destabilization
seismic_compensation_liability
🚨
Political Exposure
$25.2M/yr
Public exposure or legal/political escalation forcing large PR/legal expenditures, operational restrictions and potential compensation.
media_leak
government_inquiry
litigation
Personnel
53 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 18 | Dedicated site security and rapid-response teams; rotation to provide 24/7 coverage. Mapped to security wages [#10]. |
| Research Scientist | 20 | Core multidisciplinary research staff (geology, biology, anomalous physics/thaumaturgy). Mapped to research salaries [#15]. |
| Technician / Lab Technician | 6 | Lab and ROV technicians, sample handling and instrument maintenance; included in research/headcount estimates [#7,#6]. |
| Engineer / Maintenance | 4 | Civil/mechanical engineers for shaft and lift maintenance, power systems and heavy equipment upkeep. Mapped to shaft maintenance and facilities [#3,#4]. |
| Medical Officer | 2 | Onsite medical staffing and medevac coordination; mapped to medical recurring costs [#18]. |
| Administrative Staff | 3 | Site management, HR, accounting and liaison functions; mapped to administrative overhead [#25]. |
Confidence Notes
Line-item ranges are drawn from analyst estimates; major uncertainties remain around the choice of shaft construction method and the size of catastrophic liabilities, which dominate one-time capital needs. Recurring operational estimates are better constrained but still depend on decisions about scale of National Guard collaboration and research ambition.