SCP-751
Euclid
?
low confidence
SCP-751
Expected annual
$1.4M
One-time setup
$1.1M
Annual recurring
$1.4M
Personnel
14
Initial capital (facility/equipment/setup) is moderate (~$1.08M) with recurring operations driven by personnel, contract research, and contingency/recovery preparedness (~$1.37M/yr). Major cost drivers that can rapidly increase total exposure are remediation/contingency for sewer/water spread, legal/insurance, and large-scale research facility upgrades.
One-Time Capital Costs
Total: $1.1M
Annual Recurring Costs
Total: $1.4M/yr
Cost Scenarios
📊
Baseline
(baseline)
$1.4M/yr
Normal operational year with no major incidents; all recurring programs run as budgeted.
no breach
routine operations
🚨
Minor Incident
$1.4M/yr
Localized containment incident requiring overtime, extra disposals, limited remediation and increased consumable use.
small containment breach
localized sewer detection
🚨
Major Breach
$1.9M/yr
Significant breach requiring sprinkler saline deployment, site-wide remediation, mass decon and large-scale disposal.
sprinkler saline activation
sewer/water contamination near facility
🚨
Catastrophic Breach
$51.4M/yr
Uncontrolled spread into municipal sewers/waterways requiring multi-agency response, large-scale remediation and public health interventions.
city-level spread
multi-jurisdictional remediation
🚨
Research Scaleup Retrofit
$2.4M/yr
Decision/year in which facility upgrades to an in-house BSL-3/4 certified research suite (capital retrofit) to perform live-specimen work.
in-house live-specimen research decisions
grant/operational directive to self-contain research
Personnel
14 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#10] 2 guards per shift, 3 shifts = 6 guards (included in staff_wages). |
| Containment Technician | 3 | [#11] One on-call technician per shift (3 technicians total). |
| Containment Supervisor / Senior | 1 | [#11] Senior containment supervisor (included in staff_wages). |
| Research Scientist | 2 | [#11] Rotational researchers for periodic tests and studies (included in staff_wages/contracting assumptions). |
| Maintenance / Janitorial / Decon Crew | 2 | [#12] 1–2 FTEs for sanitation, chamber cleaning and decon; modeled as 2 FTEs (included in staff_wages). |
Confidence Notes
Wide ranges in capital options (sprinkler retrofit, BSL upgrades), uncertain incident frequencies and large tail risks (environmental spread) make precise costing difficult; many items are optional or scenario-driven.