SCP-7558
Thaumiel
~
medium confidence
SCP-7558
Expected annual
$3.4M
One-time setup
$64.1M
Annual recurring
$2.5M
Personnel
17
One-time archival, preservation, and contingency reserves dominate costs (~$64M); baseline annual operations for a disassembled thaumiel asset are modest (~$2.54M) but reactivation or breach scenarios can push annual spending into the multi-millions.
One-Time Capital Costs
Total: $64.1M
Annual Recurring Costs
Total: $2.5M/yr
Cost Scenarios
📊
Baseline
(baseline)
$2.5M/yr
Asset remains disassembled and components stored in cold vaults with minimal active operations; RAISA performs periodic checks and archival preservation.
asset_disassembled
cold_storage_maintenance
🚨
Reactivation And Recommissioning
$16.5M/yr
RAISA or Foundation leadership authorizes reassembly and reactivation of SCP-7558 (bringing WELL back online), including power installation and elevated staffing and MTF readiness.
reactivation_order
engineering_reassembly
power_infrastructure_installation
🚨
Major Breach
$10.7M/yr
Containment incident or anomalous activation requiring large-scale response, emergency containment, remediation, and legal/PR operations.
containment_failure
anomalous_activation
external_exposure
Personnel
17 total
| Role | Count | Notes |
|---|---|---|
| Paratech Engineer / Anomalous-Systems Technician | 6 | [#4] Baseline lower-end staffing (6 specialists at ~$120k/yr each) to maintain parts, inspect spares and perform limited maintenance. |
| Security Officer / Onsite Guard | 6 | [#12] Baseline security staffing (6 guards/officers to cover archive shifts; salaries/benefits included in recurring security wages). |
| Research Scientist / Digital Preservationist | 3 | [#14] Digital conservators and archival specialists (baseline 3 FTEs for migration/format preservation). |
| Administrative Staff / Audit & Coordination | 2 | [#20] RAISA management, auditors, and coordination staff (baseline 2 FTEs). |
Confidence Notes
Estimates are medium confidence: the SCP article and analyst notes explicitly list many cost categories and ranges, but wide ranges (e.g., historical capital, escrow reserve, MTF readiness) and dependence on operational posture (disassembled vs active) introduce substantial uncertainty.