SCP-756
Euclid
~
medium confidence
SCP-756
Expected annual
$3.8M
One-time setup
$16.4M
Annual recurring
$3.8M
Personnel
16
Initial capital expenditure is dominated by space-rated EVA suits/MMUs, custom probes and interceptor R&D, with total one-time costs in the low tens of millions; recurring annual operations (staff, maintenance, secrecy, and research) are roughly $3.8M driven by personnel and secrecy/monitoring costs.
One-Time Capital Costs
Total: $16.4M
Annual Recurring Costs
Total: $3.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$3.8M/yr
Normal operational year with routine monitoring, scheduled maintenance, training and research; no major incidents or large-scale interventions.
routine_monitoring
scheduled_maintenance
standard_research
🚨
Minor Incident
$4.0M/yr
Localized incident requiring rapid response: probe loss or damage, single interceptor engagement against a Planet IV satellite, suit breach needing limited replacements and medical care.
probe_loss
single_interceptor_launch
suit_breach
🚨
Major Breach
$5.3M/yr
Significant escalation: Planet IV builds multiple weapons requiring coordinated interceptor launches, replacement of multiple probes/suits, accelerated containment upgrades and major secrecy/PR/legal actions.
multiple_satellite_weapons
coordinated_interceptor_campaign
emergency_containment_upgrades
Personnel
16 total
| Role | Count | Notes |
|---|---|---|
| Project Lead / Site Director | 1 | [#13] Senior manager responsible for operations and liaison. |
| Research Scientist (senior) | 3 | [#13] Astrophysicists/xenobiologists leading observation and analysis. |
| Technician / Probe Operator | 6 | [#13] Technicians for suits, probes, imaging systems and routine maintenance. |
| Security Officer / Containment Staff | 4 | [#13, #22] On-site security and containment personnel (background-checked). |
| Engineer / Maintenance | 1 | [#13] Systems engineer responsible for airlocks, interceptors and power/HVAC. |
| Administrative Staff | 1 | [#13] Administrative, scheduling and clerical support. |
Confidence Notes
Analyst notes provide fairly detailed line items and ranges allowing mid-range estimates, but many items (custom probes, interceptors, level of human intervention) have wide uncertainty; costs and probabilities are therefore approximate.