SCP-758
Safe
~
medium confidence
SCP-758
Expected annual
$583K
One-time setup
$1.4M
Annual recurring
$560K
Personnel
5
One-time fit-out and research equipment (~$1.36M) dominate capital costs (including a conditional containment upgrade); baseline recurring annual costs are mid-six-figure, driven primarily by research staff wages, therapy services, and administrative overhead.
One-Time Capital Costs
Total: $1.4M
Annual Recurring Costs
Total: $560K/yr
Cost Scenarios
📊
Baseline
(baseline)
$560K/yr
Normal uneventful year with standard care, research, and maintenance; no major incidents or containment escalation.
routine research
standard medical care
no containment incidents
🚨
Minor Incident
$610K/yr
Localized incident (medical emergency, brief containment breach/wander requiring emergency response and temporary relocation/research ramp-up).
medical emergency/ambulance
temporary relocation or additional short-term staffing
use of contingency funds
🚨
Containment Escalation
$1.6M/yr
Subject's anomalous behavior escalates or new hazardous capability is discovered, requiring major containment upgrade and elevated operational costs.
discovery of hazardous ability
reclassification to Euclid/Keter
major structural/upgrades and armed security
Personnel
5 total
| Role | Count | Notes |
|---|---|---|
| Research Scientist | 1 | [#9] Lead researcher responsible for study design, oversight, and subject interaction; salary included in staff_wages. |
| Research Assistant | 1 | [#9] Research assistant / data technician supporting observation and testing; salary included in staff_wages. |
| On-call Physician / Medical Officer | 1 | [#10, #7] Part-time/on-call clinical staff for urgent consults and routine medical needs; retainer/salary portion included in staff_wages and medical_care. |
| Administrative Staff | 1 | [#15] Administrative support (HR/payroll/PR liaison) providing overhead and cover management; portion of salary included in staff_wages and administrative_overhead. |
| Housekeeping / Facility Technician | 1 | [#4, #5] Single FTE or contracted equivalent for room maintenance, laundry, and minor repairs; costs allocated under facilities_maintenance. |
Confidence Notes
Line items and broad ranges are well-identified from containment notes, but many items (exfiltration cost, contingency sizing, therapy intensity, and conditional upgrade scope) are highly variable; medium confidence in aggregated baseline, lower confidence for extreme escalation estimates.