SCP-7647
Unknown
~
medium confidence
SCP-7647
Expected annual
$52.0M
One-time setup
$251.8M
Annual recurring
$49.8M
Personnel
50
Initial capital expenditures are dominated by contingency construction and capital equipment (~$252M one-time). Annual baseline operating costs are roughly $49.78M/yr, driven primarily by MTF personnel wages, large contingency/reserve lines, airborne contracts, and vehicle/equipment sustainment.
One-Time Capital Costs
Total: $251.8M
Annual Recurring Costs
Total: $49.8M/yr
Cost Scenarios
📊
Baseline
(baseline)
$49.8M/yr
Uneventful year with no major incidents; routine monitoring, preparedness and maintenance only.
no_manifestations
routine_maintenance
no_large_incidents
🚨
Minor Incident
$52.8M/yr
One or a small number of typical manifestations requiring platoon deployment, local evacuation, remediation and limited contractor support.
single_manifestation
local_evacuations
moderate_remediation
🚨
Major Incident
$79.8M/yr
Clustered or high-impact manifestation requiring heavy demolition, large buyouts or extended operations and contractor mobilization.
clustered_manifestations
extended_demolition
large_property_compensation
🚨
Catastrophic Breach
$249.8M/yr
Extremely rare, high-severity event requiring national military assets, strategic escalation and multi-region response.
multi-site_manifestations
national_escalation
strategic_air_and_heavy_ordinance
Personnel
50 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 35 | MTF Eta-5 mechanized platoon maintained at high readiness; includes medics/mechanics/EOD within platoon. Mapped to #3. |
| Watchfloor Analyst / Dispatcher | 8 | 24/7 monitoring staff for the early-warning system and dispatch; mapped to #2. |
| Research Scientist | 7 | Central research program (biology, behavior, climatology, engineering); mapped to #11. |
Confidence Notes
Estimates use midpoints of wide ranges provided by analyst notes; many costs are scenario-dependent (per-incident scaling, political decisions, choice to use amnestics) so uncertainty remains significant but the main cost drivers (personnel, contingency reserves, vehicle/airborne sustainment) are well-identified.