Expected annual
$718K
One-time setup
$1.8M
Annual recurring
$712K
Personnel
11
Initial one-time setup is estimated at $1,840,500 driven by land, site construction, major scientific instruments (sonar, lab gear) and contingency reserves; recurring annual costs are estimated at $712,500 driven by staff wages, cover/legal costs, logistics, and ongoing research/maintenance.
One-Time Capital Costs
Total: $1.8M
Annual Recurring Costs
Total: $712K/yr
Cost Scenarios
📊
Baseline
(baseline)
$712K/yr
Normal year with no major incidents; routine operations, maintenance, and planned research only.
routine_operations
scheduled_maintenance
standard_research
🚨
Minor Incident
$782K/yr
Localized equipment damage or destructive experiment requiring emergency mobilization and modest equipment replacement.
equipment_destruction
emergency_heavy_mobilization
small-scale_outsourcing
🚨
Major Breach
$1.1M/yr
Significant containment-compromising incident or catastrophic equipment loss requiring large-scale emergency response, replacement and legal/PR containment.
major_equipment_failure
public_exposure_or_legal_incident
large_scale_replacement/relocation
Personnel
11 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 4 | [#11] On-site rotating guards to prevent unauthorized access and maintain cover story. |
| Research Scientist | 3 | [#12] Researchers/technicians conducting monitoring, imaging and experiments. |
| Site Director / Executive Staff | 1 | [#12] Site director/administrator for daily operations, oversight and liaison with HQ. |
| Engineer / Maintenance | 1 | [#13] Electrician/engineer for generators, HVAC and facilities systems. |
| Cleaner / Groundskeeper | 1 | [#13] Routine site upkeep, firebreaks, and environmental mitigation. |
| Logistics Coordinator / Admin | 1 | [#13] Scheduling transport, supplies and contracts with local providers. |
Confidence Notes
Detailed line-item estimates are provided in analyst notes (land, construction, instruments, and recurring staffing), but location-dependent variables (land price, local labor, transport) and high uncertainty around anomalous interactions and equipment destruction reduce confidence to medium.