SCP-7700
Euclid
~
medium confidence
SCP-7700
Expected annual
$5.2M
One-time setup
$7.2M
Annual recurring
$4.9M
Personnel
12
First-year/setup costs are dominated by a large contingency reserve and durable site/IT/vehicle purchases; ongoing annual costs are driven by continuous staffing (security + SOC), research programs, and cover-up/legal/liaison budgets.
One-Time Capital Costs
Total: $7.2M
Annual Recurring Costs
Total: $4.9M/yr
Cost Scenarios
📊
Baseline
(baseline)
$4.9M/yr
Normal year with no major incidents; standard operations, maintenance, and research continue.
no major improbable incidents
routine maintenance and research
🚨
Minor Incident
$5.1M/yr
Localized destructive event requiring equipment replacement, modest repairs, and limited cover-up/forensics.
localized property/room destruction
single-vehicle loss or sensor array damage
small-scale public exposure requiring limited cover-up
🚨
Major Incident
$6.9M/yr
Significant destructive event (safehouse loss, multiple vehicles/equipment destroyed) with large repair and cover-up costs and expanded forensic/research response.
catastrophic safehouse damage
major public incident requiring large cover-up
multiple equipment and vehicle losses
🚨
Catastrophic Incident
$12.9M/yr
Widespread/high-cost disaster (mass property damage, large-scale civilian impact) triggering major drawdown of contingency reserves and multi-agency operations.
multi-site destruction
mass-casualty events or large-scale exposure
full deployment of contingency reserve
Personnel
12 total
| Role | Count | Notes |
|---|---|---|
| Security Officer / MTF Agent | 6 | [#1] Six full-time armed guards (3 shifts) to provide continuous on-site monitoring and immediate incident control. |
| SOC Operator | 4 | [#2] Video/telemetry operators monitoring live feeds and detectors. |
| SOC Supervisor | 1 | [#2] Supervisor/rotating analyst overseeing SOC operations. |
| Research Scientist / Liaison (SCP-7700-1) | 1 | [#12] Long-term employment compensation for SCP-7700-1 (retained staff/senior liaison). |
Confidence Notes
Estimates are based on detailed analyst-provided ranges for personnel, equipment, and contingency needs; anomaly unpredictability and broad ranges for incident costs reduce precision to medium confidence.